Laserfiche WebLink
ENVIRONMENTAL HEALTHDEPARTMENT <br /> PQ1 SAN JOAQUIN COUNTY <br /> 4' .X Donna K.Heran,R.E.H.S. Unit Supervisors <br /> a. � 304 East Weber Avenue,Third Floor Carl Borgman,R.E.H.S. <br /> Director <br /> Al Olsen,R.E.H.S. Stockton, California 95202 Mike Huggins,RE.H.S.,R.D.I. <br /> _ <br /> c•.• �P Program Manager Telephone: (209)468-3420 Douglas Margaret <br /> Wilson,R.E.H.S.RtiFga� t Lagorio,R.E.H.S. <br /> Laurie A.Cotulla,R.E.H.S. Fax: (209)464-0138 Robert McClellon,R.E.H.S. <br /> Program Manager <br /> Mark Barcellos,R.E.H.S. <br /> TO: INSTALLERS AND OWNERS OF NEW UNDERGROUND STORAGE TANKS <br /> San Joaquin County Environmental Health Department(EHD) has established the following guidelines to <br /> assist you in the completion of your construction project. The guidelines specify the construction and <br /> monitoring criteria necessary to complete our review of your proposed underground storage tank(UST) <br /> system. <br /> 1. SlIF3MITTAL OF PLANS <br /> INSTALLATION: <br /> a. Submit 3 complete sets of drawings illustrating the locations of all existing and proposed <br /> structures, including existing UST(s), in non-erasable print to EHD. Upon approval, one set <br /> will be retained by EHD and the other two will be returned. <br /> b. Include equipment and material specification sheets and manufacturer's brochures <br /> describing field testing procedures, operating and monitoring systems and listing numbers <br /> or other evidence of a nationally recognized testing organization approval. All proposed <br /> leak detection methods and equipment must meet the requirements specified in 40 CFR <br /> 280.40 and have been reviewed by the State Water Resources Control Board Staff. <br /> C. All interstitial monitors must perform according to manufacturer's standards, and must be <br /> tested annually in accordance with section 2630 (d), California Code of Regulations <br /> (CCR),Title 23 Waters, Division 3, Chapter 16. <br /> d. Include a detailed monitoring and response plan in accordance with section 2632 (d) (1) & <br /> (2), CCR,Title 23 Waters, Division 3, Chapter 16. <br /> e. The plans should include a cross sectional diagram of the tank and piping system including <br /> secondary containment, overflow protection equipment, and extension of all pipes and/or <br /> ports from below grade to finish grade. <br /> f. Submit a completed"EHD Service Request"form and the State Water Resources Control <br /> Board "Facility Permit(A)" and "Tank Permit(B)"application forms. <br /> SITE MITIGATION: <br /> a. In the event contamination is observed, confirmed or suspected as a result of a leaking <br /> UST system it is the responsibility of the owner or operator to submit a workplan to EHD <br /> Site Mitigation Unit prior to initiating any assessment or remediation activities. To <br /> minimize delays, a Corrective Action Plan may be submitted concurrent with tank closure <br /> or installation plans. Address one copy of the Corrective Action Plan to the Site Mitigation <br /> Unit for review. For further assistance contact the Site Mitigation Unit at(209)468-3450. <br /> 1 <br />