00 so <br /> 2. ELAN R VI W AND DE RATIN ' PERMIT FEES <br /> a. New facility plan review fee of$712.00 (8 hour minimum per facility), $500.00 facility fee <br /> (includes one tank), $125.00 per tank after the first tank, plus$10.00 state surcharge fee <br /> per tank is due at time of plan submittal plus$17.50 per site state surcharge. <br /> b. New installation of an additional tank at an existing facility is$712.00 plan review fee (8 <br /> hour minimum per facility) plus$500.00 facility(includes one tank), $125.00 per new tank <br /> after first tank, and $10.00 per new tank state surcharge fee. <br /> C. It should be noted that a$712.00 plan review check fee required for each submittal allows <br /> for up to eight(8) hours of staff review and/or inspection time. Additional time spent on <br /> plan review, meetings, inspections, phone or office consultations will be billed to the <br /> applicant at a rate of$89.00 per hour. <br /> d. The maximum review time for UST installation plans is 40 working days. A preliminary <br /> review will be conducted by the EHD within 20 working days of submittal date to identify <br /> any gross plan deficiencies. <br /> e. If gross deficiencies are identified, the plans will be returned with a checklist identifying <br /> plan deficiencies. <br /> f. To expedite the review of installation plans,time and a half per hour overtime fee may be <br /> submitted to have review completed within 10 working days of submittal date if staff is <br /> available to perform the review. <br /> 3. ELAN HEMLIEW—GLIMELINM <br /> a. The enclosed plan review sheet is to be completed and submitted with the three sets of <br /> drawings to EHD. <br /> b. A copy of the California UST Regulations may be obtained from the California State Water <br /> Resources Control Board at (916) 227-4303. <br /> C. Permits and/or plan check approval may also be required by the San Joaquin Valley <br /> Unified Air Pollution Control District,the County/City Building Department and the Fire <br /> District in your respective area. <br /> d. A minimum of 3 inspections will be conducted on the UST system installation. An$89 per <br /> hour inspection fee shall be charged for additional inspections or reinspection as required. <br /> (See required inspections below) <br /> e. Applicant/contractor to adhere to the approval plan and any change or deviation shall be <br /> reported to and approved by EHD prior to installation. <br /> f. The application for installation of underground tanks is only valid for the calendar year in <br /> which it has been issued. A permit may be extended into the next calendar year if a letter <br /> is sent to EHD requesting this extension thirty days prior to the end of the calendar year. A <br /> one time, one year extension may be granted by EHD upon receipt of this letter. <br /> 4. gF® IIR D INSP .TIONS <br /> Note: The contractor's EHD approved plans of the UST installation shall be retained at the job <br /> 2 <br />