Laserfiche WebLink
Whenever the tanks are stored at the site,chock them in place to WARNING:When the tank is under pressure,the manways and/or <br /> prevent rolling.(See Figure 1-2).Tie them down if high winds are fittings may dislodge or the tank may rupture and result in death, <br /> expected. severe personal injury,or property damage.Before beginning the <br /> After delivery and before pre-installation testing,visually inspect test notify all people on the test site to remain in a safe location. <br /> the entire exterior surface of the tank for signs of damage(holes, ALWAYS ATTEND THE TANK DURING THE TEST.Avoid extended <br /> cracks or deep scrapes). exposure to the manways,fittings and ends of the tank during <br /> Verify that all of the safe-delivery provisions of the Xerxes"Damage the test. <br /> Free Delivery"program have been followed.Sign the drivers CAUTION:The maximum test pressure is 5 PSIG(3 PSIG when <br /> release form. testing a twelve-foot tank). <br /> RIIII <br /> - F11 <br /> HE <br /> MAX _ <br /> I'I 5 PSIG <br /> T11 I I 1111M <br /> ( _ ) HE <br /> FIGURE 1-2 M _ <br /> - II = <br /> All Xerxes tanks are tested prior to shipment but it is required that <br /> all tanks be tested prior to installation in order to verify the absence <br /> of shipping and handling damage.In the unlikely event of a leak,it <br /> is most likely to develop at a manway or a fitting.After installation s e <br /> and before backfilling to grade,the test must be repeated to verify <br /> that no damage has occurred during installation.Refer to the 1. Open one service fitting.Check to see that all remaining service <br /> appropriate section below for the instructions for testing a single fittings are properly doped,plugged and tightened. <br /> wall tank,a double wall tank with a dry interstitial space or a double 2. Install the test manifold in the open service fitting.Connect the <br /> wall tank with a liquid-filled interstitial space. pressure.source to the test manifold.(See Figure 2-2). <br /> If damage is detected,DO NOT ATTEMPT REPAIRS.Contact the 3. Pressurize the tank to 5 PSIG(3 PSIG when testing a 12-foot <br /> UST Coordinator at the Xerxes plant nearest you or the Technical tank).Add or remove air as necessary and allow the pressure <br /> Service Department at Xerxes'corporate office.Telephone numbers to stabilize. <br /> are found on the last page of this manual. <br /> 4. Close the valve on the test manifold.Disconnect the air <br /> Construct a test manifold as shown in Figure 21.The air supply supply line. <br /> gauge must have a maximum full-scale reading of 15 PSI with 1/4 5. Monitor the pressure for one hour.Soap the entire exterior of <br /> or 1/10 Ib.increments.The pressure relief valve must be rated at a the tank and watch for active air bubbles which indicate a leak. <br /> maximum of 6 PSI(4 PSI for 12-11oot tanks)to reduce the risk of <br /> overpressurizing the tank.The tester is responsible for verifying 6. When the test is complete,carefully release the air pressure <br /> that all of the test equipment is in good working condition and from the tank by opening the air supply valve.The air supply line <br /> properly configured. should already have been disconnected.Remove the test manifold. <br /> FROM COMPRESSOR <br /> FROM COMRESSOR <br /> AIR SUPPLY VALVE PRESSURE RELIEF DEVICE AIR SUPPLY VALVE <br /> AIR SUPPLY GAUGE <br /> PRESSURE RELIEF AIR SUPPLY GAUGE SERVICE FITTING <br /> DEVICE <br /> SERVICE FITTING <br /> TEST MANIFOLD <br /> FIGURE 21 FIGURE 2-2 <br />