Laserfiche WebLink
HOLDDOWN STRAPS: <br /> Xerxes FRP straps must be used when a tank is to be anchored. <br /> The location of holddown straps for each tank is marked on the WARNING:Do not use air pressure to test tanks that contain <br /> tank by the arrow()()symbol.Complete data for holddown flammable or combustible liquids or vapors.The fuel/air mixture <br /> straps are given in Figure 7-2 and Table 7-2. may explode and cause death,severe personal injury or property <br /> CAUTION:Place the straps only in the locations designated by the damage.Tanks that will be ballasted with a flammable product <br /> arrow symbol(><). should be air tested before ballasting. <br /> To evenly distribute buoyancy loads,tighten all holddown straps WARNING:If product is used as ballast,exercise special care in <br /> uniformly until they are snug over the ribs but cause no deflection handling.Safeguard against sparks,fire or product spills.Improper <br /> of the tank.Make an intermediate measurement of the tank diame- handling of product can cause a fire or explosion,and may result <br /> ter AFTER the straps have been installed and tightened. in death,severe personal injury or property damage. <br /> HARDWARE AND ANCHORING POINTS: INTERMEDIATE DEFLECTION MEASUREMENT <br /> Anchoring hardware and anchor points must be sized according After backfill is brought to the top of the tank,make an intermediate <br /> to Table 7-3.The installing contractor is responsible for providing measurement of vertical deflection according to the instructions <br /> hardware and anchor points of sufficient strength.The particular in Section 13. <br /> configuration of hardware will be determined by the owner or the TEST <br /> owner's representative.Locate the anchor points as shown in After the tank has been measured and vertical deflection is deter- <br /> Table 7-2.Refer to dimension"E".Align all anchor points with the mined to be within the limits specified by Xerxes,the tank must be <br /> marked(><)location on the tanks,within a tolerance of ± 1".For tested to ensure that no damage occurred during installation.The <br /> specific information on hardware,cable,cable clamps and their procedure in Section 2 Pre-installation Testing should be followed, <br /> use,consult the manufacturers of these items. soaping all exposed areas of the tank and all fittings. <br /> Because most of the tank exterior is no longer visible,the tank <br /> TABLE 7-3 must be tested by checking the gauge at the test manifold for any <br /> TANK 3,000& 4,000- 8,000- drop in pressure.Carefully relieve the pressure in the tank and <br /> CAPACITY Below 6,000 GREATER remove the hose/valve assembly from dry Double Wall tanks. <br /> WIRE ROPE DIA 3/8" 1/2" 1/2" <br /> (6 x 19 IPS) ; <br /> TURNBUCKLE DIA. WARNING:Do not use air pressure to test tanks that contain <br /> JAW/ 1/2" 5/8" 3/4" flammable or combustible liquids or vapors.The fuel/air mixture <br /> ' HOOKK 1/2" 3/4" 1" may explode and cause death,severe personal injury,or property <br /> ANCHOR RATING(LBS.) 9,000 21,000 25,000 damage.Tanks that will be ballasted with a flammable product <br /> should be air tested before ballasting. <br /> WARNING:If product is used as ballast,exercise special care in <br /> handling.Safeguard against sparks,fire or product spills.Improper <br /> handling of product can cause a fire or explosion,and may result <br /> in death,severe personal injury or property damage. <br /> The tank may be ballasted after the backfill is even with the top <br /> of the tank and post-installation testing has been successfully <br /> completed Only under wet-hole conditions as described in <br /> ® Section 6,should ballast be added before the backfill is even with <br /> the top of the tank.When filling the tank,make sure the tank is <br /> properly vented.The vent must be large enough to allow the <br /> displaced air to escape. <br /> oo�da0oo 0 000 <br /> �8 00°0°000 80° 0000 <br /> q800°0 o�oo� p�O 0°00° <br /> 000 <br /> oo° <br /> p 00o0000 Q• OOOo O�oo�Opp00000 <br /> 000000 ,'O,• 000 � OO O <br /> -_=VIII �I�I-X111 <br /> VIII =VIII=IIID�VIII VIII-VIII <br /> NOTE:All exposed metal on the holddown straps,tumbuckles and/or threaded rod <br /> must be coated or galvanized to prevent corrosion. <br /> NOTE:When fastening wire cable,use a minimum of three clamps on each joint. <br /> Use shacid"pe or chair-type damps as appropriate. <br />