Laserfiche WebLink
SWRCB,January 2002 Page 1 of 2 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: W Piping Manufacturer r Industry Standard r Professional Engineer <br /> Other(Specify) <br /> Test Method Used By: W Pressure r Vacuum r Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: gauge Equipment Resolution: 0 loss <br /> 1 Tank G premium) {Wank&;:premtuml' (Teak 5-midgrasYe} r Tauk mzdgrade) <br /> STP Contaiitr4erit 1-to 1/2, STP Confa timent I"to 7/8, STP Containment 1 to 1/ S"1"P 1�btttarn Zicait 1 to 1MO <br /> �' 3 5/6 9110,11/1 <br /> 3/4,5/6 9/Itt 1; 12 <br /> Piping Material: dw flex dw flex dw flex dw flex <br /> Piping Manufacturer: unknown unknown unknown unknown <br /> Piping Diameter: 2 in. 2 in. 2 in. 2 in. <br /> Length of Piping Run: 100 ft. 100 ft. 100 ft. 100 ft. <br /> Product Stored: PREMIUM PREMIUM MIDGRADE MIDGRADE <br /> Method and location of <br /> piping-run isolation: sump sump sump sump <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min 5 min <br /> starting test: <br /> Test Start Time: 14:42:00 14:42:00 13:15:00 13:15:00 <br /> Initial Reading(RI): 5.00000 PSI 5.00000 PSI 5.00000 PSI 5.00000 PSI <br /> Test End Time: 15:42:00 15:42:00 14:15:00 14:15:00 <br /> Final Reading(RF): 5.00000 PSI 5.00000 PSI 5.00000 PSI 5.00000 PSI <br /> Test Duration: 1 hr 1 hr 1 hr 1 hr <br /> Change in Reading(RF-RI): 0.00000 PSI 0.00000 PSI 0.00000 PSI 0.00000 PSI <br /> Pass/Fail Threshold or +/-0.00000 +/-0.00000 +/-0.00000 +/-0.00000 <br /> Criteria: <br /> eS ReSU1t:, Pass T'ass PASS ' <br /> 77 <br /> k- <br /> Comments-(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> line A goes to disp 1-6 line b goes to disp 7-12 <br />