My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2360
>
2300 - Underground Storage Tank Program
>
PR0507204
>
COMPLIANCE INFO_2009-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/29/2024 11:25:26 AM
Creation date
6/23/2020 6:58:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2012
RECORD_ID
PR0507204
PE
2361
FACILITY_ID
FA0007735
FACILITY_NAME
7-ELEVEN INC #32262
STREET_NUMBER
2360
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
23819001
CURRENT_STATUS
01
SITE_LOCATION
2360 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0507204_2360 W GRANT LINE_2009-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 2 of 2 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: r Piping Manufacturer r Industry Standard r Professional Engineer <br /> r Other(Specify) <br /> Test Method Used By: W'Pressure r Vacuum r Hydrostatic <br /> r Other(Specify) <br /> Test Equipment Used:_gaSe Equipment Resolution: 0 loss <br /> 77777"777 <br /> sa uwwo <br /> 'STP Contain I <br /> 718 <br /> 2 ment I t <br /> T, <br /> Piping Material: dw flex dw flex <br /> Piping Manufacturer: unknown unknown <br /> Piping Diameter: 2 in. 2 in. in. in. <br /> Length of Piping Run: 100 ft. 100 ft. ft. ft. <br /> Product Stored: REG UNLEAD REG UNLEAD <br /> Method and location of <br /> piping-run isolation: sump sump <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min min min <br /> starting test: <br /> Test Start Time: 12:05:00 12:05:00 <br /> Initial Reading(RI): 5.00000 PSI 5.00000 PSI <br /> Test End Time: 13:05:00 13:05:00 <br /> Final Reading(RF): 5.00000 PSI 5.00000 PSI <br /> Test Duration: I hr I hr <br /> Change in Reading(RF-R,): 0.00000 PSI 0,00000 PSI <br /> Pass/Fail Threshold or +/-0.00000 +/-0.00000 <br /> Criteria: <br /> PASSaS0 <br /> s <br /> Comments-(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> line A goes to disp 1-6 line b goes to disp 7-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.