My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
755
>
2300 - Underground Storage Tank Program
>
PR0508090
>
COMPLIANCE INFO_2007-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 9:01:09 AM
Creation date
6/23/2020 6:58:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2013
RECORD_ID
PR0508090
PE
2361
FACILITY_ID
FA0007938
FACILITY_NAME
CHEVRON #208117**
STREET_NUMBER
755
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
24202029
CURRENT_STATUS
01
SITE_LOCATION
755 S TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0508090_755 S TRACY_2007-2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
560
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pie Charts • � Page 1 of 2 <br />Raymond von Flue [EH] <br />From: Raymond von Flue [EH] <br />Sent: Tuesday, November 25, 2008 8:16 AM <br />To: 'Joe Nguyen' <br />Cc: Michelle Henry [EH] <br />Subject: RE: SR0055977 for Chevron 755 S Tracy Blvd <br />Tracking: Recipient Delivery Read <br />'Joe Nguyen' <br />Michelle Henry [EH] Delivered: 11/25/2008 8:16 AM Read: 11/25/2008 8:23 AM <br />Joe, <br />My question was, will any new conduit be trenched for the ISD (pressure sensor) equipment? I realize that <br />the vapor polisher can be run through the existing tank annular conduit. Will you sacrafice the existing <br />intercom conduit for installing the ISD wiring or run new conduit? A tank integrity test will be required <br />because they will be trenching new conduit on top of the tank to the vent rack. Any time concrete is broken <br />on top of a UST we require a tank integrity test within seven days of replacing the concrete. Also you did not <br />answer my question regarding the dispensers, will they be replaced or will existing ones be utilized? The 91 <br />tank will have to be not monitored for a short time so that the wires from the vapor polisher can be connected <br />to the J Box. If the 91 tank is not monitored for a lengthy period of time, then it will be required to be placed <br />under a vacuum while the wiring additions are made. Please respond quickly as this is a RUSH permit and <br />that way I can approve it right away. RvF <br />From: Joe Nguyen[mailto:joe.nguyen@fiediergroup.com] <br />Sent: Tuesday, November 25, 2008 7:25 AM <br />To: Raymond von Flue [EH] <br />Subject: RE: SR0055977 for Chevron 755 S Tracy Blvd <br />Hi Raymond, <br />Per the plan, the conduit will be new from vent riser to the existing 91 annular (this is for the vapor <br />polisher). The conduit from the existing 91 annular to Veeder Root is existing. <br />No penetration to any existing sump, hence, contractor will not perform tank integrity test. <br />During the construction, the Veeder Root system will remain active to monitor the tanks. <br />Thanks <br />Joe Nguyen <br />From: Raymond von Flue [EH] [mailto:rvonflue@sjcehd.com] <br />Sent: Monday, November 24, 2008 3:29 PM <br />To: Joe Nguyen <br />Subject: SR0055977 for Chevron 755 S Tracy Blvd <br />11/25/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.