Laserfiche WebLink
—S <br />Page of <br />S_ CF.CnNDARV PiPF, TESTING <br />Test Method Developed By: <br />❑ Piping Manufacturer ® Industry Standard <br />❑ Other (Spec) <br />❑ Professional Engineer <br />Test Method Used: <br />® Pressure <br />❑ Other (Spec) <br />❑ Vacuum <br />❑ Hydrostatic <br />Test Equipment Used: DIAL GAUGE <br />Equipment Resolution: 0 to 15" PSI <br />Piping Material: <br />Piping 7 7 <br />Piping <br />Piping <br />Fiberglass <br />Piping <br />Piping Manufacturer: <br />S <br />Piping Diameter: <br />Length of Piping Run: <br />Feet Feet ,!% <br />Feet <br />Feet <br />Product Stored: <br />T7 <br />y <br />Method and location of <br />piping -run isolation: <br />Test Boot in Sump <br />Test Boot in Sump <br />Test Boot in Sump <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />15 Minutes <br />15 Minutes <br />15 Minutes <br />Test Start Time: <br />Y., /e,^ <br />9- s <br />Initial Reading (Rr): <br />5 PSI <br />5 PSI <br />5 PSI <br />5 PSI <br />Test End Time: <br />/0: ra <br />/0., / 4 <br />Final Reading (RF): <br />S' PSI <br />5 PSI <br />PSI <br />PSI <br />Test Duration: <br />1 Hour <br />1 Hour <br />1 Hour <br />1 Hour <br />Change in Reading (RF -Rd: <br />16 PSI <br />0 PSI <br />PSI <br />PSI <br />Pass/Fail Threshold or <br />Criteria: <br />Zero <br />Zero <br />Zero <br />Zero <br />Test;Result:. <br />Pass ❑Fail <br />,, Pass :1Fail ' <br />® Pass <br />❑ Fail <br />❑ Pass ❑Fall- <br />Comments — (include information on repairs made prior to testing, and recommended follow -u for failed tests) <br />Chevron # 208117 <br />755 S Tracy Blvd <br />Tracy, Ca <br />08128 SB989 <br />