My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
755
>
2300 - Underground Storage Tank Program
>
PR0508090
>
COMPLIANCE INFO_2007-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 9:01:09 AM
Creation date
6/23/2020 6:58:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2013
RECORD_ID
PR0508090
PE
2361
FACILITY_ID
FA0007938
FACILITY_NAME
CHEVRON #208117**
STREET_NUMBER
755
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
24202029
CURRENT_STATUS
01
SITE_LOCATION
755 S TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0508090_755 S TRACY_2007-2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
560
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F • <br /> �'� a��Bo� 4! �� _ �Q�,o r�® as �•.d�4����ac� ��G���d��}� C1���rc�� �EQ� <br /> e <br /> The EBW AutoLimter°is a mechanical overfill auks which prevents <br /> overfilling of the flank while it is being filled. It is an automatic shut-off " T <br /> valve designed to be installed in the 4"riser pipe of underground storage °flap stage spring loadedhck.* ofF <br /> g p p g g flapper reduces line shock: <br /> tanks.The vertical float design reduces line shock by reducing the flow a Vertical float design allows for <br /> of product into the tank in two stages.When the tank is being filled and valve to be removed even when <br /> reaches 90% capacity the flowthrough the valve is limited to 10%.When tank is full. <br /> the tank reaches the 95%full level,the flow through the valve is limited a Inspection test port. <br /> to 5% its normal flow. ` Q Bottom tube threads on. . <br /> z <br /> i. <br /> k 0 <br /> t <br /> ULC MH21090 <br /> **Biofuel Approved(ESS and Biodiesel) <br /> Phase 1 Cert <br /> SEAMLESS FLANGED ,.* and 12 models VR-101tion,-11 <br /> TOP TUBE #4, r <br /> (Excluding-11 and MATERIALS <br /> -12 models) <br /> Valve Body:Aluminum <br /> I _ Floats:Polyethylene <br /> FACTORY SUPPLIED Y Upper&Lower Tube:Aluminum <br /> First Stage Flapper:Zinc <br /> HEAVY WALL <br /> l ' Second Stage Flapper:Acetal <br /> t ALUMINUMTUBING Pp <br /> Seals to OD of valveGuide Rod:Stainless steel <br /> �o. s <br /> d <br /> 2ND STAGE - <br /> f FLOAT I • <br /> - t- s- . • o o .o- o <br /> j 1STSTAGE 9 •- ,.-I�, . <br /> VI <br /> • FLOAT �' •f o o e .a a -a e o o ,o <br /> FLAPPERS <br /> �i Cr <br /> IST STAGE & — <br /> hII 2ND STAGEIT <br /> " <br /> THREAD ON E <br /> ';, LOWER DROP '' <br /> TUBEALUMiNUM <br /> X11 ; . <br /> (to be field cut) <br /> VALVE BODY <br /> i <br /> a � • <br /> i <br /> t <br /> l <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.