My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
755
>
2300 - Underground Storage Tank Program
>
PR0508090
>
COMPLIANCE INFO_2007-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 9:01:09 AM
Creation date
6/23/2020 6:58:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2013
RECORD_ID
PR0508090
PE
2361
FACILITY_ID
FA0007938
FACILITY_NAME
CHEVRON #208117**
STREET_NUMBER
755
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
24202029
CURRENT_STATUS
01
SITE_LOCATION
755 S TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0508090_755 S TRACY_2007-2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
560
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
;IV, <br /> { <br /> 'q Mr <br /> 708-491-01* Dual point Outside of valve body Thread on 601152.4 16140.64 96/243.84 172/436.88 <br /> 708-491-02* Dual point Outside of valve body Thread on 60/152.4 16140.64 120/304.8 1961497.84 <br /> Attached <br /> 708-491-11*** Dual Point Factory installed Thread on 76/193 totoptube 961243.84 172/436.9 <br /> Attached <br /> 708-491-12*** Dual Point Factory installed Thread on 76/193 totoptube 1201304.8 196/497.8 <br /> 708-491-21** Dual Point Outside of valve body Thread on 60/152 16/40.64 96/243.89 1721436.88 <br /> 708-492-01* Dual point Outside of valve body Thread on 120/304.8 16/40.64 96/243.84 2321589.28 <br /> 708-492-02* Dual point Outside of valve body Thread on 1201304.8 16/40.64 120/304.8 2561650.24 <br /> . . . . . . .. . .. . . . . <br /> Attached <br /> 708-492-11*** Dual point Factory installed Thread on 120/304.8 totoptube 96/243.84 2161548.6 <br /> Attached <br /> 708-492-12*** Dual point Factory installed Thread on 120/304.8 totoptube 120/304.8 240/609.6 <br /> 708-493-01 Coaxial Inside of valve body Thread on 60/152.4 16/40.64 96/243.84 172/436.88 <br /> 708-493-02 Coaxial Inside of valve body Thread on 601152.4 16/40.64 1201304.8 1961497.84 <br /> Dual point <br /> 708-494-04 Valve/Adaptor Kit Outside of valve body Rivet on NIA 16/40.64 NIA NIA <br /> *ULC Approved <br /> Note.Drop tube height can be adjusted in the field. C <br /> *ULC MH21090 <br /> **Blofuel Approved(E85 and Biodiesel) <br /> a, *�EVR Phase 1 Certification,-11 <br /> and-12 models VR-101 <br /> Top of riser <br /> A Riser pipe <br /> Top of flank <br /> --95 <br /> ----------- <br /> B oO <br /> U.S.T. fl <br /> C . <br /> Bottom of tank <br /> 6"standard spacing or per lata[code <br />
The URL can be used to link to this page
Your browser does not support the video tag.