My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
755
>
2300 - Underground Storage Tank Program
>
PR0508090
>
COMPLIANCE INFO_2007-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 9:01:09 AM
Creation date
6/23/2020 6:58:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2013
RECORD_ID
PR0508090
PE
2361
FACILITY_ID
FA0007938
FACILITY_NAME
CHEVRON #208117**
STREET_NUMBER
755
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
24202029
CURRENT_STATUS
01
SITE_LOCATION
755 S TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0508090_755 S TRACY_2007-2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
560
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Autolimiter® H Automatic <br /> °Two-stage,spring-loaded shut-off i Shut-off Vallee <br /> flapper reduces line shock. <br /> °Vertical float design allows for valve The Autolimiter®overfill prevention valve is 10 ----• <br /> to be removed even when tank is full. { - a self contained two-stage positive shut-off -� �= ,' RIVET ON TOP <br /> valve designed to prevent the overfill of an A, s <br /> °Inspection test port, underground storage tank(UST)during a ; <br /> gravity fed product delivery.When the liquid J t r`< <br /> ^Bottom tuba threads on. level of the UST reaches about 92%of the <br /> i— fxM- <br /> - tank capacity during a fell,the product In the <br /> tank rases the Power float of the valve.The <br /> - primary poppet of the valve is then released + •, <br /> Valve body:aluminum. <br /> and reduces flow to about 10%of normal <br /> ° t <br /> flow.The sudden reduction inflow created <br /> Floats:polyethylene. by the closing of the primary poppet <br /> °Upper and lower tube:aluminum. i provides"line shock"to the fill hose I{ <br /> notifying the transport delivery driver the Ir` <br /> i <br /> First stage flapper:zinc. tank is nearing 95%capacity.The transport I �' <br /> 1 •Second stage flapper:acetal, delivery driver can then stop filling the tank, 1 f <br /> I •Guide rod:stainless steel, disconnect and drain the delivery hose.The ,t- �� PROTECTED <br /> - - ' upper float will close off the product flow r `` G�! <br /> FLOAT SYSTEM <br /> completely,providing positive shut-off <br /> when the product level reaches 95%of <br /> the tank capacity. E <br /> Models of the Autolimiter°exist to comply <br /> with almost:any underground storage tank r <br /> application including standard dual point <br /> vapor recovery,dual point CARB EVR + <br /> vapor recovery,dual point blofuel <br /> applications and single point coaxial fiil <br /> and vapor return applications. d <br /> i installer note:The Autolimiter®iI is designed <br /> solely for use in underground storage tanks. <br /> For gravity drops only.No attempt should be +; TEST PORT <br /> made to utilize this product with <br /> 1 aboveground storage tanks.The valve r;� <br /> + would not function,creating a very <br /> dangerous condition. r ' `l; THREAD ON <br /> This product is for use in tight fill 1 —BOTTOMTUBE <br /> applications only. ro +` STANDARD <br /> km WIN <br /> _ 708-491-01' Dual point Outside valve body Thread on <br /> 708-491-02' Dual point Outside valve body Thread on <br /> 708-491-11'- Dual point Factory installed Thread on <br /> 1708-491-12"' Dual jpolnt Factory installed Thread on <br /> i 708-491-21' Dual point Outside valve body Thread on <br /> 1 708-492-01' Dual point Outside valve body Thread on <br /> j 708492-02' Dual point Outsldevalve body_ Thread on <br /> 708-492-11" Dual point Factory installed Thread on <br /> 708-492-12" Dual point Factory installed Thread on <br /> 708-493-01 Coaxial Inside valve body Thread on <br /> 708-493-02 Coaxial inside valve body Thread on <br /> 708-494-04 DualF?19t valve/adapter kit Outside valve body Rivet on <br /> . <br /> • "ULC MH21090. <br /> "EVR Phase 1 Certification VRA 01. <br /> "'Biofue! <br /> approved rn odel(E85 and biodiesei). <br /> 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.