Laserfiche WebLink
SWRCB,January 2002 - Page of <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer ❑✓ Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum ❑Hydrostatic <br /> ❑✓ Other(Spec) inches-1 hr visual test <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: Inches-Ihr vlaealMEN= eai <br /> Spill Box#87 FB Spill Box#91 FB Spill Box#87 VB Spill Box#91 VB <br /> Bucket Diameter: 12" 12" 12" 12" <br /> Bucket Depth: 12.5" 12.5" 14" 14" <br /> Wait time between applying <br /> pressure/vacuum/water and 15 minutes 15 minutes 15 minutes 15 minutes <br /> starting test: <br /> Test Start Time: 8:39am 8:46am 8:39am 8:46am <br /> Initial Reading(RI): 11.5 inches-1hr visual test 11.75 --lhrvis ses1 13.25 inches-1hr vlseal test 13.375 "chs�-1h,vlseslh <br /> Test End Time: 9:39am 9:46am 9:39am 9:46 <br /> Final Reading(RF): 11.5 inches-1hr visual teal 11.75 I^c^ee-ihrvisualiest 13.25 13.375 inches-1hr 4 <br /> Test Duration: 1 hr 1 hr 1 hr 1 hr <br /> Change in Reading(RF-RI): 0 0 0 0 <br /> Pass/Fail Threshold or 0 0 0 0 <br /> Criteria: <br /> Test Result: ZPass ❑Fail ❑✓ Pass ❑Fail ✓❑Pass Fail <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> 87 & 91 fill buckets - replaced lower o'rings <br />