My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
755
>
2300 - Underground Storage Tank Program
>
PR0508090
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 9:09:31 AM
Creation date
6/23/2020 6:58:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0508090
PE
2361
FACILITY_ID
FA0007938
FACILITY_NAME
CHEVRON #208117**
STREET_NUMBER
755
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
24202029
CURRENT_STATUS
01
SITE_LOCATION
755 S TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0508090_755 S TRACY_2018.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A9 Tanknology <br />Emergency Stop (E -Stop / ESO) Periodic Inspection <br />Site #: CHEVRON #208117 208117 Date: 2/2/2018 <br />Address: 755 S. TRACY BLVD Name: Tim Elebeck <br />City / State: TRACY CAI Technician f k Lu k <br />Technician Signature: <br />The objective of this test is to provide assurance that the when the E -Stop switch is activated, all the fueling system circuits (turbines, and <br />dispensers) are de -energized, and remain de -energized until they are re -set manually). The test procedures and guidelines shall be in accordance <br />with the E -Stop Testing Process. <br />1 Number of E -Stop switches INSIDE of the building: 1 <br />2 Number of E -Stop switches OUTSIDE of the building: 3 <br />3 <br />You have added or confirmed that all E -Stop locations are on the Site Diagram <br />ro <br />r <br />r <br />4 <br />Do all E -Stops shutdown power to ALL DISPENSERS <br />r. <br />r <br />r <br />5 <br />Do all E -Stops shutdown power to ALL STP's <br />r <br />r <br />r <br />6 <br />Are ALL E -Stops clearly Labeled <br />re <br />r <br />r <br />7 <br />Are the TURBINE BREAKERS clearly identified / labeled <br />r <br />r <br />r <br />MIN <br />16 <br />MIMM-102 W— Me MM= <br />8 <br />All equipment secured and any access ports, lids, enclosures are closed. <br />r. <br />r <br />r <br />9 <br />All safety barricades and test equipment has been properly removed <br />re <br />r <br />r <br />10 <br />E -Stop was reset and all dispensing functions are normal <br />ro, <br />r <br />r <br />E -Stop Inspection Results <br />11 <br />PAI FAIL I INCONCLUSIVE <br />SS <br />WO: 2334338 <br />
The URL can be used to link to this page
Your browser does not support the video tag.