Laserfiche WebLink
A9 Tanknology <br />Emergency Stop (E -Stop / ESO) Periodic Inspection <br />Site #: CHEVRON #208117 208117 Date: 2/2/2018 <br />Address: 755 S. TRACY BLVD Name: Tim Elebeck <br />City / State: TRACY CAI Technician f k Lu k <br />Technician Signature: <br />The objective of this test is to provide assurance that the when the E -Stop switch is activated, all the fueling system circuits (turbines, and <br />dispensers) are de -energized, and remain de -energized until they are re -set manually). The test procedures and guidelines shall be in accordance <br />with the E -Stop Testing Process. <br />1 Number of E -Stop switches INSIDE of the building: 1 <br />2 Number of E -Stop switches OUTSIDE of the building: 3 <br />3 <br />You have added or confirmed that all E -Stop locations are on the Site Diagram <br />ro <br />r <br />r <br />4 <br />Do all E -Stops shutdown power to ALL DISPENSERS <br />r. <br />r <br />r <br />5 <br />Do all E -Stops shutdown power to ALL STP's <br />r <br />r <br />r <br />6 <br />Are ALL E -Stops clearly Labeled <br />re <br />r <br />r <br />7 <br />Are the TURBINE BREAKERS clearly identified / labeled <br />r <br />r <br />r <br />MIN <br />16 <br />MIMM-102 W— Me MM= <br />8 <br />All equipment secured and any access ports, lids, enclosures are closed. <br />r. <br />r <br />r <br />9 <br />All safety barricades and test equipment has been properly removed <br />re <br />r <br />r <br />10 <br />E -Stop was reset and all dispensing functions are normal <br />ro, <br />r <br />r <br />E -Stop Inspection Results <br />11 <br />PAI FAIL I INCONCLUSIVE <br />SS <br />WO: 2334338 <br />