Laserfiche WebLink
17� <br />SWRCB, January 2002 <br />SECONDARY PIPE TESTING <br />F--] <br />Page 'A of <br />Test Method Developed B3. ping Manufacturer El Industry Standard 0 Professional Engineer <br />&P�l <br />0 her (Spec�fy) <br />Test Method Used: IyPressure 0 Vacuum D Hydrostatic <br />Nther (Spec, <br />-ft_.__'.. <br />'07ng <br />W <br />n • , s .. ' <br />• , e Run# <br />Piping Run <br />i <br />Piping Material: <br />Piping Manufacturer-. <br />Piping Diameter: <br />Length of Piping Run- <br />A <br />=77� <br />Method and location of <br />piping -run isolation: <br />lying <br />�"e between appMI <br />and <br />n1vt <br />St I &Lest*. <br />Test Start Time: <br />i Initial Reading (Rj): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in (RReading F <br />W, <br />cis/fa—il —Thr�s­hold or <br />Criteria: <br />Ult <br />Tes Res : <br />0 Fail <br />Comments — (include information on repairs made prior to testing, and recommended.follow-upforfailed <br />