Laserfiche WebLink
rA <br />El <br />SWRCB, January 2002 Page of <br />6. PIPING SUMP TESTING <br />Test Method eveloped By: 0 Sump Manufacturer 0 Industry Standard ofessional Engineer <br />0 Other (Specify) <br />Test Method Used: 1 F- Pressure <br />0 Vacuum Xhydrostatic <br />0 Other (Specify) <br />VTest Equipment Used: CA kk Le�pe_ C�a, � �CA, V�l �Equipment R�esolutio�n- <br />-Al�� , :�'V �1__ <br />Sump Diameter: <br />Sump Depth: <br />Sump Material: <br />_.. <br /># II . Y• I�il.. #lit i ! � � <br />� .. i' <br />� _. <br />� . �`.. <br />Portion of Sump Tested' <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)? <br />Was fail-safe verified to be <br />operational?" <br />test: <br />Test Start Time: <br />= -ON <br />Test End Time: <br />Final Reading (11p):i. <br />Test Duration: <br />Change in Reading (RF -i <br />Pass/Fail Threshold or Criteria: <br />Test Result: <br />NA <br />0 Yes 0 No 0 NA <br />Comments — Cinclude information t:11ii revairs ma, rior to testing, and recommerarledfollow-u forfailed tests) <br />' if the entire depth of the sump is not tested, specify how much was tested. if the answer to M of the questions indicated with <br />asterisk(") is"NO" or"NA", the entire sump must be tested. (SeeSWRCBLG-l60) i <br />