My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
322
>
2300 - Underground Storage Tank Program
>
PR0516472
>
COMPLIANCE INFO_2010-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2024 12:51:43 PM
Creation date
6/23/2020 6:58:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2013
RECORD_ID
PR0516472
PE
2361
FACILITY_ID
FA0012628
FACILITY_NAME
UNITED #5449
STREET_NUMBER
322
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14906111
CURRENT_STATUS
01
SITE_LOCATION
322 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0516472_322 S CENTER_2010-2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"NIFIED PROGRAM CONSOLIDATED FORM RECEIVED UNDERGROUND STORAGE TANK <br />MONITORING PLAN - (Page 1 of 2) <br />q <br />AR 3 2011 <br />490-1 <br />. <br />TYPE OF ACTION d 1. NEW PLAN ® 2. CHANGE OF INFORMATION <br />PLAN TYPE I3 1. MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. SAN A COUNTY <br />490-2 <br />(Check one item only) [32. THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM( $)- PAQQr <br />lr <br />L 'j, <br />I <br />.,.��i1 :;,FAGILITYINFORMATION`;'1� <br />'� , „i - ,.r., , <br />i r <br />FACILITY ID # (Agency tie Only)- i <br />!`' t -' <br />e.; <br />BUSINESS NAME (Sameas FACILITY NAME) Stockton Gas # GSEP <br />3. <br />BUSINESS SITE ADDRESS 322 South Center Street 103 <br />CITY Stockton <br />I04. <br />Testing, preventive maintenance, and calibration of monitoring equipment (e.g., sensors, probes, line leak detectors, etc.) must be performed at the frequency <br />specified by the equipment manufacturers' instructions, or annually, whichever is more frequent, and that such work must be performed by qualified personnel. <br />23 CCR 2632, 2634, 2631, 2641 - -_- -_ -- -- - ___-- -- - - - - - --- -- - - -- - - - - - <br />----a <br />- -- - - - --_� - <br />MONITORING EQUIPMENT IS SERVICED ® 1. ANNUALLY ❑ 99. OTHER (Specify): <br />490-;6 <br />it ajP:S,, jl f ,x;, ' �`3 a'll;t:'1+� ' 1 i4 ,,,I,,..;;.t> ;. :N <br />,�,�;xtrI`.,,III MONITORING LO-ATIO li t6� ktflal4t i t _v4� - <br />® 1. NEW SITE PLOT MAN/MAP SUBMITTED WITH THIS PLAN. ❑ 2. SITE PLOT PLAN/,-81AP PREVIOUSLY SUBMITTED. (23 CCR §2632, <br />2634)490-4 <br />ISPERFORMED;;USING THE FOLLOWINGe;)1IETH'OD ti'`.;I,' "1 <br />® 1. CONTINUOUS ETI'CTRONIC TANK MONITORING OF ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT <br />490-5 <br />VAULT(S) WITHAUDIBLE AND VISUAL ALARMS. (23 CCR §2632,2634) <br />SECONDARY CONTAINMENT IS: ® a. DRY El b. LIQUID FILLED C1 c. PRESSURIZED [Id. UNDER VACUUM <br />0-90-6 <br />----------------------------------------------------------------------------------------------------------- -------------------------------------------------------------------- <br />490-7. <br />PANEL MANUFACTURER: Veeder Root MODEL #: TLS -350 <br />LEAK SENSOR MANUFACTURER: Veeder Root 490'9I MODEL #(S): 794390-409 <br />49°-l0 <br />❑ 2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANK(S). (23 CCR §2643) <br />490-11 <br />PANEL MANUFACTURER: 490-11 MODEL #: <br />490-13 <br />- <br />- -- -- - -- - ___ - -- - ---- - - - - - --------------------------------------------------------- <br />IN -TANK PROBE MANUFACTURER: 490-14. MODEL #(S): <br />490 -Is <br />-- <br />------------------------------------------------------------------------------------------------------------------------------------------------------------------------ <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS ❑ b. DAILY/NIGHTLY ❑ c. WEEKLY <br />w_-1 <br />490-16 <br />❑ d. MONTHLY ❑ e. OTHER (Specify): <br />490-17 <br />- <br />- -- - - - --- - - --- - --- - - - - - ------------------------------------------------------ <br />PROGRAMM13DTESTS: ❑ a. 0.1 h. ❑ b. 0.2 h. ❑ c. OTHERS eci <br />g.p.h. g.p.h. (Specify): <br />49018 <br />490-19 <br />❑ 3. MONTHLY STATISTICAL INVENTORY RECONCILIATION (23 CCR §2646.1): <br />490-20 <br />4WEEKLY MANUXL TANK GAUGING MTG 23 CCR 2645 TESTING PERIOD: ❑ a. 36 HOURS ❑ b. 60 HOURS <br />E]. ( ) ( § )• <br />490-21 <br />490-22 <br />❑ 5. TANK INTEGRITY TESTING (23 CCR §2643.1): <br />490-23 <br />490 24 <br />TEST FREQUENCY: Ela. ANNUALLY F1 b. BIENNIALLY El c. OTHER(Specify): S eci <br />a90-zs <br />® 99. OTHER (Specify}: Simplicity <br />490-26 <br />490-27 <br />METHODS) (Ch`ecklall that apply) <br />; " t' <br />M4jVITORING:IS,PERFORMED VSING;THE FOLLOWING , <br />® 1. CONTINUOUS I%MITORING OF PIPE/ PIPING SUDiP(S) AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND <br />490-28 <br />VISUAL ALARMS. (23CCR §2636) <br />SECONDARY COIAINMENT IS: ®a. DRY ❑b. LIQUID FILLED ❑c. PRESSURIZED ❑d. UNDER VACUUM <br />N <br />490-z9 <br />------------------------------------------------------------------ ---------------------------------------------------------- <br />490-30 <br />PANEL MANUFACTURER: Veeder Root MODEL #: TLS -350 <br />490-31 <br />- _ -- <br />--------------------- - -- - - - - - <br />490.32 <br />LEAK SENSOR MANUFACTURER: Veeder Root MODEL #(S)_ 794380-208 -- <br />490.33 <br />-- - --- - -- _ _____i_ <br />- --- - - - - ------------- <br />PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN. ® a. YES ❑ b. NO <br />490 J4 <br />FAILURE/DISCONWZrION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a. YES ❑ b. NO <br />490-35 <br />® 2. ,NIECHANICAL LINE LEAK DETECTOR (INILLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br />FLOWi�1HEN A LEAK IS DETECT ED (23 CCR J2636) ---------------------------- <br />----------#(S): <br />490-36 <br />_ -PRODUCT - - ------------ <br />(- <br />49017 MODEL #(S): (87) <br />490-3s <br />MLLD MANUFACTURER(S): (87) Vaperless / (91) FE Petro 91 STP -MLD <br />STP- <br />❑ 3. ELECTRONIC LPIE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS (23 CCR §2636) <br />490-39 <br />--- ----------------------------------------------------- ---------- ------------------------------------------------------------------- <br />ELLD MANUFACTURER(S) 490'40 MODEL #(S): <br />490-41 <br />-------------------------------------------------------------- ------ ------------------------------------------------------------- <br />PROGRAMMED BILINE LEAK TEST: ❑ 1. MINIMUM MONTHLY 0.2 g.p.h. ❑ 2. MINIMUM ANNUAL 0.1 g.p.h. <br />0-90-42 <br />ELLD DETECTIONOF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ❑ b. NO <br />49043 <br />ELLD FAILUREIDISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ❑ b. NO <br />490-44 <br />❑ 4. PIPE INTEGRITVTESTING 490-x5 <br />TEST FREQUENCY ❑ a. ANNUALLY ❑ b. EVERY 3 YEARS ❑ c. OTHER (Specify) 490-46490-47 <br />❑ 5. VISUAL PIPE MONITORING. <br />490-48 <br />FREQUENCY ❑ a. DAILY ❑ b. WEEKLY ❑ c. MIN. MONTHLY & EACH TIME SYSTEM OPERATED- <br />490-49 <br />• Allowed for monitoringetunbuned emergency generator fuel piping only per HSC 425281.5(6)(3 <br />NMIEET <br />❑ 6. SUCTION PIPIT MEETS E�CEIPTION CRITERIA�123CCR §2636(a)(3)I. <br />ago -so <br />S REGPER HEALTH AND SAFEE, DIVISION 20, CHAPTER 6.7 IS CONNECTED TO TILE TANK SYSTEM <br />490-51 <br />❑ 99. OTHER (Specify) <br />490-52 <br />ago -s3 <br />UST Response Plan (3/2=) 3/3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.