Laserfiche WebLink
Am <br />FIED PROGRAM CONSOLIDATED FORM EC Qc(���r <br />RECEIVED <br />UNDERGROUND STORAGE TANK �/alt--� <br />MONITORING PLAN (Page 2 of 2) <br />1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD SAN JOAQUIN COUNTY 490-54a <br />490.4b <br />IE 1. CONTINUOUS ELECTRONIC MONITORING 112. FLOAT AND CHAIN ASSEMBLY ❑ 3. ELECTRON I N&ENCY SERVICES <br />❑ 4. NO DISPENSERS ❑ 99. OTHER (Specify)_- <br />__ - ___ <br />PANEL MANUFACTURER: Veeder Root a9ass i MODEL #: TLS -350 490-56. <br />LEAK SENSOR MANISACTURER: Veeder Root 490 57 {MODEL #(S) 794380-208 490-58 <br />DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ® ..YES ❑ b. NO 490-59 <br />UDC LEAK ALARMTRIGGERS AUTOMATIC PUMP SHUTDOWN ® a. YES ❑ b. NO 490-60 <br />FAILURE / DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a. YES ❑ b. NO 490-61 <br />UDC MONITORINGSTOPS THE FLOW OF PRODUCT AT THE DISPENSER. ® a. YES ❑ b. NO 490-62 <br />2. UDC CONSTRUCTION IS ❑x 1. SINGLE -WALLED ❑ 2. DOUBLE -WALLED 490.63 <br />IF DOUBLE WALLED: 49o -64a <br />UDC INTERSTITIALSPACE IS MONITORED BY: ❑ 1_ LIQUID—❑ 2. PRESSURE ❑ 3_ VACUUM — _ _ _ _- __ <br />_ <br />A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a. YES ❑ b. NO 490-64b <br />-,PERIODIC-'SYSTEM'TESTING '. ". <br />❑ 1. ELD TESTING: TWS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490 -65 - <br />LEAK DETECTIP_N LDS MUST BE PERFORMED_ PERIODIC_ ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. CCR §2644._I) —_ <br />- - ---------------------------------- - <br />------------ - - - 490-66 <br />® 2. SECONDARY CONTAINMENT COi•IPONENTS ARE TESTED EVERY 36 1LONTHS <br />® 3. SPILL BUCKETS ARE TESTED ANNUALLY. 490-67 <br />!" <br />.;iVIILtRECORDKEEPING? <br />The following monitoringAnnintenance records are kept for this facility: <br />® Alarm logs 490-68a 11 Visual Inspection Records 490-68b ❑ Tank integrity testing results 490-68e <br />❑ SIR testing results (andsupporting documentation records). 490-69d ❑ Tank gauging results (and supporting documentation records). 490.68e <br />❑ ATG Testing results (ad supporting documentation records). 490-6ef ❑ Corrosion Protection 60 -day logs 490-681; <br />® Equipment maintenaneeand calibration records. 490.68h <br />P <br />3�t,`�,;=IX:TRAINING <br />® Personnel with UST mmitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490-69a <br />REFERENCE DOCUNENTS MAINTAINED AT FACILITY (Check all that apply) <br />® THIS UNDERGROUND STORAGE TANK MONITORING PLAN (Required) 490.69b <br />® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) 490-69c <br />❑ CALIFORNIA UMERGROUND STORAGE TANK REGULATIONS 490-69d <br />❑ CALIFORNIA UMERGROUND STORAGE TANK LAW 490-69e <br />❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br />STATISTICAL Rii/ENTORY RECONCILIATION" 490-69[ <br />❑ SWRCB PUBLICATION: "UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490-698 <br />❑ OTHER (SpecifyyW%, M69i <br />® This facility has a "Desigttated UST Operator" who has passed the California UST System Operator Exam administered by the Intemational Code Council (ICC). <br />The "Designated UST OpeMor" will train facility employees in the proper operation and maintenance of the UST systems annually, and within 30 days of hire. This <br />training will include, but isnot limited to, the following: <br />> Operation of the USi'systems in a manner consistent with the facility's best management practices <br />> The facility emplo)ees role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br />> The facility employe¢ s role with regard to spills and overfills as specified in the UST Response Plan <br />> Names of contact paton(s) for emergencies and monitoring alarms. 490-70 <br />;.„i;"�u,r{,�:=ry�LVl«?:;;.. X.tCOMMENTS/ADDITIONAL''INFORMATION- ' `' <br />Provide additional commeiahere or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. 490-71 <br />ov l ►o :Fla <br />y" rXL''PERSONNEL-.RESPONSIBILITIES '' f- - <br />The UST Owner/Operators responsible for ensuring that: 1) the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br />this plan occurs, 2) all coaitions that indicate a possible release are investigated, and 3) all monitoring records are maintained properly. <br />The following person(s) mmsponsible for performing the monitoring and equipment maintenance: <br />NAME Gurdeep Sino 490-72TITLE President 490-73 <br />NAME Amarjit Rai 490.74TITLE Secretary 490-75 <br />The Designated Operator all perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br />conditions that need followap action. <br />zl"14"Cl z4"XII.:OWNER/OPERATOR SIGNATURE , <br />CERTIFICATION: I minify that the information provided herein is true and accurate to the best of my knowledge. <br />APPLICAN SIGNATURE 490-76 <br />DATE: 490-77 <br />C4 <br />•ill <br />February 28, 2011 <br />R P E, ®I. Tan ra r wn d razor 3 Au h riz Re re n a iv f wn r <br />APPLICANT NAME (prat): 490-78 <br />APPLICANT TITLE: 490-79 <br />Amarjit Rai <br />Secretary <br />UST Response Plan (3/210111) 3/3 <br />