My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
15237
>
2300 - Underground Storage Tank Program
>
PR0517272
>
COMPLIANCE INFO_2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:44 AM
Creation date
6/23/2020 6:59:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011
RECORD_ID
PR0517272
PE
2361
FACILITY_ID
FA0012979
FACILITY_NAME
FLYING J TRAVEL PLAZA #617
STREET_NUMBER
15237
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
02519014
CURRENT_STATUS
01
SITE_LOCATION
15237 N Thornton Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0517272_15237 N THORNTON_2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br />R9994+t � <br />The scope of work and special equipment usage for this project includes: <br />1. layout, saw cut and removal of asphalt and concrete <br />a. concrete saw <br />b. skid steer with concrete breaker <br />c. backhoe loader <br />d. off -haul track <br />2. excavation of footings and slab area <br />a. backhoe loader <br />b. off -haul truck <br />3. installation of concrete footings and masonry containment walls <br />a. concrete grout pump <br />4. installation of concrete pad within containment area <br />5. installation of new above ground storage tank (AST) <br />a. crane <br />6. installation of related piping and pumps <br />a. Rigid 300 threader <br />b. Victaulic groover <br />7. installation of proper hold downs for AST <br />a. Hilti TE -55 roto -hammer <br />8. installation of new monitor system <br />9. testing and inspections of fuel system as required prior to service <br />10. Concrete removal above existing UST's <br />a. Saw cut, breaker <br />11. Re -configurations of products at UST's <br />a. FRP installation <br />12. Trenching and installation for new Diesel Fuel and DEF lines <br />13. Canopy work installation of DEF heated lines <br />14. Removal and replacement of Diesel Truck Island dispensers <br />15. Associated electrical <br />16. Installation of one UST DEF tank <br />17. Installation of one underground Oil water separator <br />ALL WORK AREAS WILL BE BARRICADED FROM VEHICLE AND PEDESTRIAN TRAFFIC <br />BEFORE COMMENCEMENT OF ANY WORK. IN ADDITION A 6' HIGH TEMPORARY FENCE <br />WILL BE INSTALLED AT THE PROPERTY LINES TO DISCOURAGE UNAUTHORIZED ENTRY. <br />NO EXCAVATIONS WILL BE LEFT UNPROTECTED. <br />ALL WORK WILL BE PERFORMED IN CONFORMANCE WITH INDUSTRY STANDARDS <br />AND CAL -OSHA R UIREMENTS. <br />PERSONAL PROTECTIVE EQUIPMENT MUST BE WORN AS REQUIRED BY EACH <br />TASK. ORANGE SAFETY VESTS, HARD HATS AND LEATHER WORK BOOTS WILL BE WORN <br />AT ALL TIMES. <br />Pitot TC Lodi- Site Safety Plan AST .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.