Laserfiche WebLink
Installation Follow These Directions Carefully <br />6. These units are designed for use in Class I, Group D atmospheres. <br />7 Install pumping system in accordance to applicable codes. <br />Proper motor protection must be used on three phase pump models, or motor warranty is void. To maintain <br />warranty, the magnetic starters used must be supplied by Red Jacket, or have equivalent protection features <br />defined as follows: <br />- 3 -leg protection <br />Properly sized quick trip heaters, and <br />Ambient temperature compensated overloads. <br />Follow These Directions Carefully <br />Check these points before installing. <br />1. The power supply against the equipment voltage rating. For 3 phase units, request the power company identify <br />and tag the service wires for L-1, L-2, L-3 phase sequence. <br />2. Be certain that the pump with the siphon valve is installed into the correct tank. <br />3. Check the equipment which was received against Table B and Figure 10 for the tank diameter and bury depth. <br />Before installing pipe threads apply an adequate amount of fresh, UL classified for petroleum, <br />'`='. non -setting thread sealant. <br />4. Apply thread sealant to the six-inch riser/flange male threads. Thread it into the tank port. Tighten the riser/ <br />flange until the joint is water tight. <br />1. Apply a gasket compound to the bottom surface of the manifold and press the gasket onto the manifold's <br />mating surface so the holes in the gasket and manifold align (reference Figure 1). <br />2. Coat the exposed surface of the gasket with gasket compound. <br />S. Lower the pumping unit into position utilizing the lifting eyes. Do not allow the gasket to contact the riser <br />flange until the bolt holes in the flange are aligned with those in the manifold and the discharge port is aimed in <br />the desired direction. <br />4. Insert three 3/4 inch bolts, provided, and torque them to 200 ft -Ib (271 N -m). <br />0 <br />U <br />5 <br />e <br />a <br />I <br />