My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
15237
>
2300 - Underground Storage Tank Program
>
PR0517272
>
COMPLIANCE INFO_2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:44 AM
Creation date
6/23/2020 6:59:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011
RECORD_ID
PR0517272
PE
2361
FACILITY_ID
FA0012979
FACILITY_NAME
FLYING J TRAVEL PLAZA #617
STREET_NUMBER
15237
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
02519014
CURRENT_STATUS
01
SITE_LOCATION
15237 N Thornton Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0517272_15237 N THORNTON_2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Installation Follow These Directions Carefully <br />6. These units are designed for use in Class I, Group D atmospheres. <br />7 Install pumping system in accordance to applicable codes. <br />Proper motor protection must be used on three phase pump models, or motor warranty is void. To maintain <br />warranty, the magnetic starters used must be supplied by Red Jacket, or have equivalent protection features <br />defined as follows: <br />- 3 -leg protection <br />Properly sized quick trip heaters, and <br />Ambient temperature compensated overloads. <br />Follow These Directions Carefully <br />Check these points before installing. <br />1. The power supply against the equipment voltage rating. For 3 phase units, request the power company identify <br />and tag the service wires for L-1, L-2, L-3 phase sequence. <br />2. Be certain that the pump with the siphon valve is installed into the correct tank. <br />3. Check the equipment which was received against Table B and Figure 10 for the tank diameter and bury depth. <br />Before installing pipe threads apply an adequate amount of fresh, UL classified for petroleum, <br />'`='. non -setting thread sealant. <br />4. Apply thread sealant to the six-inch riser/flange male threads. Thread it into the tank port. Tighten the riser/ <br />flange until the joint is water tight. <br />1. Apply a gasket compound to the bottom surface of the manifold and press the gasket onto the manifold's <br />mating surface so the holes in the gasket and manifold align (reference Figure 1). <br />2. Coat the exposed surface of the gasket with gasket compound. <br />S. Lower the pumping unit into position utilizing the lifting eyes. Do not allow the gasket to contact the riser <br />flange until the bolt holes in the flange are aligned with those in the manifold and the discharge port is aimed in <br />the desired direction. <br />4. Insert three 3/4 inch bolts, provided, and torque them to 200 ft -Ib (271 N -m). <br />0 <br />U <br />5 <br />e <br />a <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.