My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
15237
>
2300 - Underground Storage Tank Program
>
PR0517272
>
COMPLIANCE INFO_2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:44 AM
Creation date
6/23/2020 6:59:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011
RECORD_ID
PR0517272
PE
2361
FACILITY_ID
FA0012979
FACILITY_NAME
FLYING J TRAVEL PLAZA #617
STREET_NUMBER
15237
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
02519014
CURRENT_STATUS
01
SITE_LOCATION
15237 N Thornton Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0517272_15237 N THORNTON_2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br />r7i <br />2 <br />Testing the installation Testing the Tank <br />"Testing the Tanis <br />WARNING! Disconnect, lock out, and tag power at the panel before servicing the pump. <br />When servicing equipment, use non -sparking tools and use caution when removing or installing <br />equipment to avoid generating a sparks - <br />I . Lock down the pump check valve by turning the check valve lock down screw clockwise as far as it will turn <br />(see Figure 19). <br />2. Remove the Tank `fest Plug from the riser flange. <br />3. Apply tank test pressure at the tank test port. <br />4. After the completion of the test, release the pressure by: <br />a. Turning the check valve lock down screw counter clockwise as far as it will go. <br />b. Remove the protective cover from the Pressurstat (see Figure 20) and turn the Pressurstat adjustment <br />screw counter clockwise until the screw protrudes 3/4", this will relieve the line pressure to "0" psi. <br />Apply an adequate amount of fresh, UL classified for petroleum, non -setting thread sealant on the 1/4" <br />NPT line test port plug and replace it. Torque the plug to 14 - 24 ft -lbs (19.4 - 29 N -m). <br />Adjust desired relief pressure per instructions on page 26 and replace the protective cover. <br />Purging the System <br />1. Pump a minimum of fifteen gallons (57 liters) of product through each dispenser. <br />2. Start with the dispenser furthest from the pump and work toward the pump. <br />Protective cover <br />Adjustment screw <br />(as shown 0.3 psi setting) <br />:last-aci ,r,.eus <br />Figure 20. Pressurstat - Pressure Adjustment <br />25 <br />a <br />i <br />a <br />
The URL can be used to link to this page
Your browser does not support the video tag.