My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
15237
>
2300 - Underground Storage Tank Program
>
PR0517272
>
COMPLIANCE INFO_2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:44 AM
Creation date
6/23/2020 6:59:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011
RECORD_ID
PR0517272
PE
2361
FACILITY_ID
FA0012979
FACILITY_NAME
FLYING J TRAVEL PLAZA #617
STREET_NUMBER
15237
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
02519014
CURRENT_STATUS
01
SITE_LOCATION
15237 N Thornton Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0517272_15237 N THORNTON_2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LJ <br />Testing the Installation Adjusting the Pressurstat Line Relief Pressure <br />Adjusting the Pressurstat Line Relief Pressure <br />Note: Pressurstat line relief pressure is the line pressure after the pump stops. <br />1. All. pumps are factory set to a line relief pressure of 23-28 psi (160-195 kPa), <br />2. Remove the protective cover (see Figure 20). <br />3. Adjust the relief pressure to the desired level. Turning the adjusting screw clockwise will increase the line relief <br />pressure. With the adjusting screw fully down the line relief pressure should be from 40 to 45 psi. With the <br />adjusting screw all the way up the pressure should be from 0 to 3 psi. <br />4. The line relief pressure can be verified in three locations: <br />a. The pressure can be observed from the control unit of the electronic line leak detector. <br />b. The pressure can be observed by attaching a gauge to the impact valve. <br />c. The pressure can be observed by attaching a gauge to the line test port. <br />5, After setting the desired line relief pressure replace the protective cap. DO NOT USE PIPE SEALANT. <br />Lubricate the o -ring with petroleum jelly. Tighten to just snug after the protective cover has fully bottomed out. <br />e <br />I <br />0 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.