My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
15237
>
2300 - Underground Storage Tank Program
>
PR0517272
>
COMPLIANCE INFO_2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:44 AM
Creation date
6/23/2020 6:59:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011
RECORD_ID
PR0517272
PE
2361
FACILITY_ID
FA0012979
FACILITY_NAME
FLYING J TRAVEL PLAZA #617
STREET_NUMBER
15237
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
02519014
CURRENT_STATUS
01
SITE_LOCATION
15237 N Thornton Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0517272_15237 N THORNTON_2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Service and Repair Procedure for Removal of Plug-in Type Pump- Motor Assembly <br />111111 •, -. 1111 . •. s s- * • • <br />NOTE: Not all installed pump/motor units will have a locknut securing the pump shell. Steps 3A and 11 can be <br />skipped if no locknut is present. <br />1. Place pump in a horizontal position on a clean surface. <br />2. Block up under the 3 -inch column pipe so that the pump/motor assembly is about 2 inches above supporting <br />surface. <br />3A. If a locknut is present; loosen setscrew in locknut. Unscrew the locknut from the discharge head. Slide the <br />adapter tube up to expose the four hex headmachine bolts. <br />3B. Loosen and remove the four hex head machine bolts on the top of the pumping unit just above the shell and <br />around the motor. <br />4. Do not let the pump roll. Using your hands, (do not use a wrench) hold pump at the extreme bottom end and <br />use a slight up and down motion to pull the pump from the casting attached to the 3 -inch. pipe. <br />NOTE: Up and down motion to remove the pump unit should not be greater than 1/4 inch. Motion greater than <br />114 inch could damage a positioning dowel pin in the top of the motor. <br />5. If the motor leads tend to stay plugged into the motor, finish removing the motor until the leads can be pulled <br />out of the top of the motor by hand (this is a "plug in" type connection). Verify the number of wires. If there are <br />only three wires, the pigtail and conduit seat must be replaced with the proper 5 -wire version. <br />6. Pull the pigtail connector in the discharge head out far enough to see the o -ring in the sidewall of its socket. <br />Remove the connector's o -ring from the connector's socket and discard it. Get a 1.234" ID x 0.139" (-218 P/ <br />N 072.712-1) wide o -ring and lubricate it with petroleum jelly. Slide the new o -ring over the pigtail connector <br />and push it in the groove in the wall of the connector's socket. Lubricate the pigtail connector body with <br />petroleum jelly and push it back into its socket, making sure the index tab is in the socket's notch. <br />t <br />HP <br />Pigtail <br />Buna Seal <br />Seal & Pigtail Kit <br />3 <br />213.065-4 <br />110.038-4 <br />213-065.5 <br />5 <br />213-069-4 <br />110-038.4 <br />213-069-5 <br />Installed pump/motor units with 3 -wire pigtails must be upgraded to the proper 5 -wire pigtail and conduit <br />seat assemblies. <br />7. Remove the block from the top of the new pump/motor. <br />8. Look at bottom of the discharge head casting which remains screwed to the 3 -inch pipe. Note the position of <br />the one hex head bolt. Place the four machine bolts through the four bolt holes. <br />NOTE: One hole (180 degrees away from the hex head) remains open, this is the locating pin hole. <br />9. Find the locating p3in on top of the motor. This pin must go into the remaining opert hole referred to in notice <br />following Step 8. <br />10. Place the new pump/motor assembly in position by starting the locating pin into the hole referred to above. <br />Gently push the motor into place until the shell starts to pass over'the large "O"ring. Position the four machine <br />bolts into the bolt holes and start threads. Draw all bolts down evenly until all are snug. After all bolts are snug, <br />torque bolts to 24-34 ft -lbs (32-46 N -m). <br />NOTE: Draw all bolts down evenly until all are snug. This will help avoid damaging the connector and dowel <br />pin. <br />9A <br />
The URL can be used to link to this page
Your browser does not support the video tag.