Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer CK Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum Xj Hydrostatic <br /> ❑Other(Spec) <br /> oTestquipment Used: Incon Incon TS-STS Tester Equipment Resolution: +/-0.002" <br /> # 87 T#3 Sump# 91 STP Sump# Sump# <br /> Diameter: 142" 42" <br /> Sump Depth: 61" 61" <br /> Sump Material: Fiberglass Fiberglass <br /> Height from Tank Top to Top of 17" 5" <br /> -Highest Piping Penetration: <br /> Height from Tank Top to Lowest 16" 14" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry <br /> Portion of Sump Tested' 23" 20" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes ❑No ®NA ❑Yes ❑No 9 NA ❑Yes ❑No 9 NA ❑Yes ❑No 9,NA <br /> -product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe ❑Yes []No k NA ❑Yes ❑No 9 NA ❑Yes ❑No 9 NA ❑Yes ❑No X NA <br /> shutdown?" <br /> Was fail-safe verified to be ❑Yes ❑No k NA ❑Yes ❑No ®NA ❑Yes ❑No K,NA [ Yes ❑No 9 NA <br /> -operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15 Minutes 15 Minutes <br /> test: <br /> Test Start Time: 9:07am 9:24am 9:07am 9:24am <br /> Initial Reading(RI): 3.6998" 3.6991" 3.4910" 3.4911" <br /> Test End Time: 9:22am 9:39am 9:22am 9:39am <br /> Final Reading(RF): 3.6991" 3.6983" 3.4908" 3.4913" <br /> Test Duration: 15 Minutes Each (30) 15 Minutes Each (30 <br /> Change in Reading(RF-R,): -0.0007 -0.0008 -0.0002 0.0002 <br /> Pass/Fail Threshold or Criteria: +/-0.002" 1 +/-0.002" +/-0.002" 1 +/-0.002" <br /> 'Test Result:s ® Pass ❑Fail 19 Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? k Yes []No [INA ®Yes ❑No ❑NA ❑Yes ❑No K NA ❑Yes Li No 9 NA <br /> Was sensor properly replaced and k Yes ❑No ❑NA ❑x Yes ❑No ❑NA ❑Yes ❑No 91 NA ❑Yes ❑No ©NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> SEP 0 8 2014 <br /> ENVIRONMENTAL L 1 <br /> DEPARTMENT <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />