My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
15237
>
2300 - Underground Storage Tank Program
>
PR0517272
>
COMPLIANCE INFO_2013-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:44 AM
Creation date
6/23/2020 6:59:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2016
RECORD_ID
PR0517272
PE
2361
FACILITY_ID
FA0012979
FACILITY_NAME
FLYING J TRAVEL PLAZA #617
STREET_NUMBER
15237
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
02519014
CURRENT_STATUS
01
SITE_LOCATION
15237 N Thornton Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0517272_15237 N THORNTON_2013-2016.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
331
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> SWRCB,January 2002 Page of <br /> 7. UNDER-DISPENSER CONTAINMENT UDC TESTING <br /> Test Method Developed By: ❑UDC Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum 9 Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Incon Incon TS-STS Tester Equipment Resolution: +/-0.002" <br /> UDC# 13 UDC# UDC# UDC# <br /> UDC Manufacturer: Unknown <br /> UDC Material: Fiberglass <br /> UDC Depth: 31" <br /> Height from UDC Bottom to Top 13" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 3„ <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to pry <br /> testing: <br /> Portion of UDC Tested 17" <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes ❑No W NA ❑Yes ❑No L NA ❑Yes ❑No 9 NA Ej Yes ❑No X NA <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail- ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No 9 NA ❑Yes ❑No ®NA <br /> safe shutdown?" <br /> Was fail-safe verified to be ❑Yes ❑No KNA ❑Yes ❑No K NA ❑Yes ❑No X NA E Yes '-]No X NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and 15 Minutes <br /> starting test <br /> Test Start Time: 10:49 am 11:05am <br /> Initial Reading Ri): 5.5564" 5.5564" <br /> Test End Time: 11:04 am 11:20am <br /> Final Reading(RF): 5.5563" 5.5556" <br /> Test Duration: 15 Minutes Each 30 <br /> Change in Reading RF-RI : -0.0001 1 -0.0008 <br /> Pass/Fail Threshold or Criteria: +/-0.002"1 +/-0.002" <br /> Test Result: ® Pass ❑Fail ❑ Pass 0 Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? Ik Yes []No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ®NA <br /> Was sensor properly replaced and R Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No 9 NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> D " <br /> CCD 0 8 2014 <br /> ' If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.