Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer VC Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Analog Gauge Equipment Resolution: +/-0.25 <br /> Piping Run# 87 Piping Run# 91 Piping Run# T2-T3 Piping Run# <br /> Piping Material: Hard Plastic Hard Plastic Fiberglass <br /> Piping Manufacturer: OPW OPW Ameron <br /> Piping Diameter: 2" 2" 2.5" <br /> Length of Piping Run: 350' 325' 15' <br /> Product Stored: 87 Unleaded 91 Unleaded 87 Unleaded <br /> Method and location of STP to UDC's STP to UDC's Tank#2 to Tank#3 <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 minutes 15 minutes 15 minutes <br /> starting test: <br /> Test Start Time: 5:30pm 5:40pm 5:20pm <br /> Initial Reading(Rj): 5.00psi 5.00psi 5.00psi <br /> Test End Time: 6:30pm 6:40pm 6:20pm <br /> Final Reading(RF): 5.00psi 5.00psi 5.00psi <br /> Test Duration: 1 Hour 1 Hour 1 Hour <br /> Change in Reading(RF-RI): 0.00 psi 0.00 psi 0.00 psi <br /> Pass/Fail Threshold or 0.00 psi 0.00 psi 0.00 psi <br /> Criteria: <br /> Test Result. ® Pass ❑Fail ® Pass ❑Fail ® Pass ❑Fail © Pass' ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> rimitnVM <br /> MARI 2 2014 <br />