My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
15237
>
2300 - Underground Storage Tank Program
>
PR0517272
>
COMPLIANCE INFO_2013-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:44 AM
Creation date
6/23/2020 6:59:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2016
RECORD_ID
PR0517272
PE
2361
FACILITY_ID
FA0012979
FACILITY_NAME
FLYING J TRAVEL PLAZA #617
STREET_NUMBER
15237
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
02519014
CURRENT_STATUS
01
SITE_LOCATION
15237 N Thornton Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0517272_15237 N THORNTON_2013-2016.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
331
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer VC Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Analog Gauge Equipment Resolution: +/-0.25 <br /> Piping Run# 87 Piping Run# 91 Piping Run# T2-T3 Piping Run# <br /> Piping Material: Hard Plastic Hard Plastic Fiberglass <br /> Piping Manufacturer: OPW OPW Ameron <br /> Piping Diameter: 2" 2" 2.5" <br /> Length of Piping Run: 350' 325' 15' <br /> Product Stored: 87 Unleaded 91 Unleaded 87 Unleaded <br /> Method and location of STP to UDC's STP to UDC's Tank#2 to Tank#3 <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 minutes 15 minutes 15 minutes <br /> starting test: <br /> Test Start Time: 5:30pm 5:40pm 5:20pm <br /> Initial Reading(Rj): 5.00psi 5.00psi 5.00psi <br /> Test End Time: 6:30pm 6:40pm 6:20pm <br /> Final Reading(RF): 5.00psi 5.00psi 5.00psi <br /> Test Duration: 1 Hour 1 Hour 1 Hour <br /> Change in Reading(RF-RI): 0.00 psi 0.00 psi 0.00 psi <br /> Pass/Fail Threshold or 0.00 psi 0.00 psi 0.00 psi <br /> Criteria: <br /> Test Result. ® Pass ❑Fail ® Pass ❑Fail ® Pass ❑Fail © Pass' ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> rimitnVM <br /> MARI 2 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.