My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
15237
>
2300 - Underground Storage Tank Program
>
PR0517272
>
COMPLIANCE INFO_2013-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:44 AM
Creation date
6/23/2020 6:59:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2016
RECORD_ID
PR0517272
PE
2361
FACILITY_ID
FA0012979
FACILITY_NAME
FLYING J TRAVEL PLAZA #617
STREET_NUMBER
15237
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
02519014
CURRENT_STATUS
01
SITE_LOCATION
15237 N Thornton Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0517272_15237 N THORNTON_2013-2016.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
331
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> SWRCB,January 2002 Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum 9 Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Incon Incon TS-STS Tester Equipment Resolution: +/-0.002" <br /> Sump# Tank#2 87 Sump# Tank#3 87 Sump# 91 Sump# <br /> Sump Diameter: 42" 42" 42" <br /> Sump Depth: 61" 61" 61" <br /> Sump Material: Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 12" 17" 5- <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 1 16" 16" 14" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Good Good Good <br /> Portion of Sump Tested' 20" 22" 19" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes []No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe ❑Yes ❑No ❑NA []Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> shutdown?` <br /> Was fail-safe verified to be ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA G,Yes ❑No i_i NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15 minutes 15 minutes 15 minutes <br /> test: <br /> Test Start Time: 10:29am 10:46am 9:44am I 10:OOam 9:44am 10:OOam <br /> Initial Reading(Rj): 5.1829" 5.1824" 3.3094" 3.3094" 4.7077" 4.7098" <br /> Test End Time: 10:44am 11:01 am 10:OOam 10:15am 10:OOam 10:15am <br /> Final Reading(RF): 5.1824" 5.1819" 3.3094" 3.3093" 4.7094" 4.7110" <br /> Test Duration: 15 Minutes Each (30) 15 Minutes Each (30 15 Minutes Each (30 <br /> Change in Reading(RF-R,): -0.0005 -0.0005 0.0000 -0.0001 0.0017 0.0012 <br /> Pass/Fail Threshold or Criteria: +/-0.002" +/-0.002" +/-0.002" +/-0.002 +/-0.002" +/-0.002 <br /> Test Result: ® Pass ❑Fail ® Pass ❑Fail ® Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? k Yes ❑No ❑NA K Yes ❑No ❑NA ®Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and k Yes ❑No ❑NA X Yes ❑No ❑NA 9 Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 'If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.