My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_JAN 2011-JUN 2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
15237
>
2300 - Underground Storage Tank Program
>
PR0517272
>
COMPLIANCE INFO_JAN 2011-JUN 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:46 AM
Creation date
6/23/2020 6:59:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
JAN 2011-JUN 2011
RECORD_ID
PR0517272
PE
2361
FACILITY_ID
FA0012979
FACILITY_NAME
FLYING J TRAVEL PLAZA #617
STREET_NUMBER
15237
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
02519014
CURRENT_STATUS
01
SITE_LOCATION
15237 N Thornton Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0517272_15237 N THORNTON_JAN 2011-JUN 2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: Piping Manufacturer x Industry Standard Professional Engineer <br /> Other(Specify) <br /> Test Method Used: x Pressure Vacuum Hydrostatic <br /> Other(Spec) <br /> Test Equipment Used:Pressure Test Gauge Equipment Resolution:+/-0.1 PSI <br /> SEMEMEMIE <br /> Piping Run#87 Piping Run#91 Piping Run#DSL Piping Run# <br /> Piping Material: Flex Flex FRP <br /> Piping Manufacturer: Western Fiberglass Western Fiberglass Ameron <br /> Piping Diameter: 2" 2" 4" <br /> Length of Piping Run: 485' 485' 240' <br /> Product Stored: Unleaded Premium Diesel <br /> Method and location of Test Boot Test Boot Test Boot <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 Minutes 15 Minutes 15 Minutes <br /> starting test: <br /> Test Start Time: 5:00 pm 5:00 pm 5:00 pm <br /> Initial Reading(R,): `5 PSI 5 PSI 5 PSI <br /> Test End Time: 6:00 pm 6:00 pm 6:00 pm <br /> Final Reading(RF): 5 PSI 5 PSI 5 PSI <br /> Test Duration: 1 Hour 1 Hour 1 Hour <br /> Change in Reading(RF-R,): 0 0 0 <br /> Pass/Fail Threshold or +/-0.2 PSI +/-0.2 PSI +/-0.2 PSI <br /> Criteria: <br /> est Result: x Pass C1 Fail x Pass ❑Fail x Pass ❑Pail 0 Pass 0 Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> We replaced the 87 test boot in dispenser #15/16. <br /> We replaced the 91 test boot in dispenser #13. <br /> We replaced the diesel test boot in stp #3. <br />
The URL can be used to link to this page
Your browser does not support the video tag.