My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_JAN 2011-JUN 2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
15237
>
2300 - Underground Storage Tank Program
>
PR0517272
>
COMPLIANCE INFO_JAN 2011-JUN 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:46 AM
Creation date
6/23/2020 6:59:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
JAN 2011-JUN 2011
RECORD_ID
PR0517272
PE
2361
FACILITY_ID
FA0012979
FACILITY_NAME
FLYING J TRAVEL PLAZA #617
STREET_NUMBER
15237
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
02519014
CURRENT_STATUS
01
SITE_LOCATION
15237 N Thornton Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0517272_15237 N THORNTON_JAN 2011-JUN 2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: Sump Manufacturer x Industry Standard Professional Engineer <br /> Other(Specify) <br /> Test Method Used: Pressure Vacuum x Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Incon TS-STS Equipment Resolution: <br /> MM= EMEMBEEMMM <br /> Sump#T-3 Sump# Sump# Sump# <br /> Sump Diameter: 47" <br /> Sump Depth: 60" <br /> Sump Material: FRP <br /> Height from Tank Top to Top of 2619 <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 1899 <br /> Electrical Penetration: <br /> Condition of sump prior to testing: OK <br /> Portion of Sump Tested 2"above highest <br /> pipe en. <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes No x NA Yes No NA Yes No NA Yes No NA <br /> product and water)?` <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe Yes No x NA Yes No NA Yes No NA Yes No NA <br /> shutdown?* <br /> Was fail-safe verified to be Yes No x NA Yes No NA Yes No NA Yes No NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15 Minutes <br /> test: <br /> Test Start Time: 12:53 pm—1:10 pm <br /> Initial Reading(RI): 5.0945 - 5.1058 <br /> Test End Time: 1:08 pm—1:25 pm <br /> Final Reading(RF): 5.0946 - 5.1065 <br /> Test Duration: 15 Min Each(30)min <br /> Change in Reading(RF-Ri): .0001 - .0017 <br /> Pass/Fail Threshold or Criteria: .002 <br /> Test Result: x Pass ❑Fail ❑ Pass ❑Fail ❑ Pass QFail Q Pass ❑Fail <br /> Was sensor removed for testing? x Yes No NA Yes No NA Yes No NA Yes No NA <br /> Was sensor properly replaced and <br /> verified functional after testin ? x Yes No NA Yes No NA Yes No NA Yes No NA <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.