My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_JAN 2011-JUN 2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
15237
>
2300 - Underground Storage Tank Program
>
PR0517272
>
COMPLIANCE INFO_JAN 2011-JUN 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:46 AM
Creation date
6/23/2020 6:59:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
JAN 2011-JUN 2011
RECORD_ID
PR0517272
PE
2361
FACILITY_ID
FA0012979
FACILITY_NAME
FLYING J TRAVEL PLAZA #617
STREET_NUMBER
15237
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
02519014
CURRENT_STATUS
01
SITE_LOCATION
15237 N Thornton Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0517272_15237 N THORNTON_JAN 2011-JUN 2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM RETROFIT REPAIR <br />It # :.. j # # <br />1. Site ;# enclosed? <br />MK:qTtrH#*!:flt a 0 # i ' <br />•c #• art �# ## # : ». • :t..# ti #_ '».. # #+ ## :#=. <br /># <br />Auto Dispensers: Repair Premium secondary run from 12 to 13 due to failed pressure teat and damaged test boot on 13. <br />Repair #13,14/15 and 18/17 due to tailed hydrostatic test. Repair unloaded 87 secondary from #16.18 due to failed pressure <br />test and damaged test boot on 18. Repair 91 Fill Bucket due to failed hydro test (Phil-Tfte). <br />Diesel Dispensers: Repair secondary run from transition sump #2-28 due to failed pressure test and torn 2" test boot on 028. <br />Repair #21 Main due to failed hydro teat. Repair Secondary nun from #20-21 due to failed pressure test. Repair #21 SAT due to <br />failed hydro test and torn 2" penetration boot. Repair Secondary run from Tanks #1,2,3 to Transition sump 01 due to failed <br />pressure test and damaged test boot In sump #3. Repalr Tank #3 due to failed hydro test and damaged 4" test booL <br />"Site Map, Test Report, Test Tapes attached* <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third•party approval): <br />Phil -Tits 5 Gallon Spill Container 500-CS-NPR-GRY - Cut Sheet Attached <br />Diversified Repair Boots and i9ts - Cut Sheet Attached <br />Split Boot Reducers - Cut Sheet Attached <br />
The URL can be used to link to this page
Your browser does not support the video tag.