Laserfiche WebLink
SWRCB, January 2002 <br />5. SECONDARY PIPE TESTING <br />Page 3 of 7 <br />Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used:Pressure Test Gauge Equipment Resolution:+/- 0.1 PSI <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />**Unleaded 87 Secondary piping run from Dispenser #15 to 16 failed pressure test due to damaged <br />test boot on dispenser #16 Repair/Retest needed. <br />** Premium 91 Secondary piping run from Dispenser #1 2 to 13 failed pressure test due to damaged <br />test boot/test port on dispenser #13 Repair/Retest needed. <br />Piping Run #87 <br />Piping Run #91 <br />EMERIENINEEMEM <br />Piping Run #87 <br />Piping Run #91 <br />Piping Material: <br />Flex <br />Flex <br />Flex <br />Flex <br />Piping Manufacturer: <br />Westernfiberglss <br />Westernfiberglss <br />Westernfiberglss <br />Westernfiberglss <br />Piping Diameter: <br />2" <br />2" <br />2" <br />2" <br />Length of Piping Run: <br />485' <br />485' <br />12' <br />12' <br />Product Stored: <br />Unleaded -87 <br />Premium <br />Unleaded <br />Premium <br />Method and location of <br />piping -run isolation: <br />Test Boot <br />Test Boot <br />Test Boot <br />Test Boot <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />15 Minutes <br />15 Minutes <br />15 Minutes <br />15 Minutes <br />Test Start Time: <br />9:00 <br />9:45 <br />10:00 <br />10:40 <br />Initial Reading (Ri): <br />5 PSI <br />5 PSI <br />5 PSI <br />5 PSI <br />Test End Time: <br />10:00 <br />10:45 <br />11:00 <br />11:40 <br />Final Reading (RF): <br />5 PIS <br />5 PSI <br />0 PSI <br />0 PSI <br />Test Duration: <br />1 Hour <br />1 Hour <br />1 Hour <br />1 Hour <br />Change in Reading (RF -RI): <br />0 PSI <br />0 PSI <br />5 PSI <br />5 PSI <br />Pass/Fail Threshold or <br />Criteria: <br />0.2 PSI <br />+/- 0.2 PSI <br />+/- 0.2 PSI <br />+/- 0.2 PSI <br />Test Result: <br />® Pass ❑ Fail <br />® Pass ❑ Fail <br />❑ Pass ® Fail <br />❑ Pass ® Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />**Unleaded 87 Secondary piping run from Dispenser #15 to 16 failed pressure test due to damaged <br />test boot on dispenser #16 Repair/Retest needed. <br />** Premium 91 Secondary piping run from Dispenser #1 2 to 13 failed pressure test due to damaged <br />test boot/test port on dispenser #13 Repair/Retest needed. <br />