My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_JAN 2011-JUN 2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
15237
>
2300 - Underground Storage Tank Program
>
PR0517272
>
COMPLIANCE INFO_JAN 2011-JUN 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:46 AM
Creation date
6/23/2020 6:59:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
JAN 2011-JUN 2011
RECORD_ID
PR0517272
PE
2361
FACILITY_ID
FA0012979
FACILITY_NAME
FLYING J TRAVEL PLAZA #617
STREET_NUMBER
15237
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
02519014
CURRENT_STATUS
01
SITE_LOCATION
15237 N Thornton Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0517272_15237 N THORNTON_JAN 2011-JUN 2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />Test Method Developed By: <br />Page 3 of 7 <br />5. SECONDARY PIPE TESTING <br />❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />® Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used:Pressure Test Gauge Equipment Resolution:+/- 0.1 PSI <br />Piping Material: <br />Piping Run #aut- DO Piping Run #DSL Piping Run #DSL Piping Run #DSL <br />Flex FRP FRP Flex <br />Piping Manufacturer: <br />Western Fiberglass Ameron Ameron Western Fiberglass <br />Piping Diameter: <br />2" 4" 4" 2" <br />Length of Piping Run: <br />485' 160 240' 260 <br />Product Stored: <br />Diesel Diesel Diesel Diesel <br />Method and location of <br />piping -run isolation: <br />Test Boot Test Boot Test Boot Test Boot <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />15 Minutes 15 Minutes 15 Minutes 15 Minutes <br />Test Start Time: <br />12:10 11:40 13:00 13:20 <br />Initial Reading (RI): <br />5 PSI 5 PSI 5 PSI 5 PSI <br />Test End Time: <br />13:10 12:40 14:00 14:20 <br />Final Reading (RF): <br />5 PSI 5 PSI 0 PSI 5 PSI <br />Test Duration: <br />1 Hour 1 Hour 1 Hour 1 Hour <br />Change in Reading (RF -RI): <br />0 PSI 0 PSI 5 PSI 0 PSI <br />Pass/Fail Threshold or <br />Criteria: <br />+/- 0.2 PSI +/- 0.2 PSI +/- 0.2 PSI +/- 0.2 PSI <br />Test Result: <br />1 ® Pass ❑ Fail 1 ® Pass ❑ Fail I ❑ Pass ® Fail I ® Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />** Truck Diesel secondary run from Tank #1 #2 and #3 to Transition Sump #1 failed pressure test due to <br />damaged 4" test boot and test port, Repair or Replace / pressure test secondary after repairs are complete. <br />**Truck Diesel secondary run from dispenser #20 to 21 failed pressure test no visual leaks. <br />** Truck diesel secondary run from Transition Sump # 2 to dispenser #28 failed press test, damaged test <br />boot on dispenser #28 (2"test boot) <br />
The URL can be used to link to this page
Your browser does not support the video tag.