Laserfiche WebLink
SWRCB, January 2002 <br />n <br />► J► J 1 � �I tK17i 110 lehl I pla ' <br />40 <br />Page 5 of 7 <br />)Cl TESTING <br />Test Method Developed By: ❑ UDC Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used:Incon TS -STS <br />Equipment Resolution:+/ -0.0001" <br />UDC Manufacturer: <br />UDC #1-2 <br />Western Fiberglass <br />UDC #34 <br />Western Fiberglass <br />UDC #5-6 UDC #7-8 <br />Western Fiberglass Western Fiberglass <br />UDC Material: <br />FRP <br />FRP <br />FRP FRP <br />UDC Depth: <br />31" <br />31" <br />31" 31" <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />12" <br />14" <br />12" 13" <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />3" <br />4" <br />4" 3" <br />Condition of UDC prior to <br />testing: <br />OK <br />OK <br />OK OK <br />Portion of UDC Tested <br />2"above highest Pipe pen <br />2"above highest Pipe pen <br />2"above highest Pipe pen 2"above highest Pipe pen <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)?* <br />❑Yes ❑No ®NA <br />❑Yes ❑No ®NA <br />❑Yes [:]No ®NA ❑Yes ❑No ®NA <br />Turbine shutdown response time <br />N/A <br />N/A <br />N/A N/A <br />Is system programmed for fail- <br />safe shutdown?" <br />❑Yes ®No ®NA <br />Ryes ❑No ®NA <br />❑Yes ❑No ®NA ❑Yes ❑No ®NA <br />Was fail-safe verified to be <br />operational?* <br />®Yes ❑No ®NA <br />❑Yes❑ No ® NA <br />❑Yes ❑No ®NA ❑Yes ❑No ®NA <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />15 Minutes <br />15 Minutes <br />15 Minutes 15 Minutes <br />Test Start Time: <br />5:05 5:21 <br />5:05 5:21 <br />3:24 3:51 3:24 3:51 <br />Initial Reading (RI): <br />3.0870 3.0866 <br />5.6703 5.6797 <br />3.7759 3.7758 7.3376 7.3376 <br />Test End Time: <br />5:20 5:36 <br />5:20 5:36 <br />3:39 4:06 3:39 4:06 <br />Final Reading (RF): <br />3.0866 3.0866 <br />5.6697 5.6696 <br />3.7760 3.7760 7.3376 7.3367 <br />Test Duration: <br />15 Min Each (30 Min) <br />15 Min Each (30 Min <br />15 Min Each 30 Min) 15 Min Each 30 Min) <br />Change in Reading (RF -RI): <br />0.0004 0.0000 <br />0.0013 1 0.0001 <br />0.0001 1 0.0002 0.0000 1 0.0009 <br />Pass/Fail Threshold or Criteria: <br />+/- 0.002" <br />+/- 0.002" <br />+/- 0.002" +/- 0.002" <br />Test Result: <br />® Pass ❑ Fail <br />® Pass ❑ Fail <br />® Pass ❑ Fail ® Pass ❑ Fail <br />Was sensor removed for testing? <br />NYes ❑No NA <br />Yes No NA <br />Yes ZNo NA ®Yes [:]No EINA <br />Was sensor properly replaced and <br />verified functional after testing? <br />®Yes ❑No ❑NA <br />11 <br />®Yes ❑No ❑NA <br />1 <br />®Yes ®No ❑NA ®Yes ❑No ❑NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />