Laserfiche WebLink
SWRCB, January 2002 Page 4 of 7 <br />6. PIPING SUMP TESTING <br />Test Method Developed By: ❑ Sump Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used:Incon TS -STS <br />Equipment Resolution:+/- 0.0001" <br />Sump #T-5 STP <br />Sump Diameter: 47" <br />Sump #Trans #1 <br />45" <br />Sump #Trans#2 <br />45" <br />Sump # <br />Sump Depth: 60" <br />58" <br />58" <br />Sump Material: FRP <br />FRP <br />FRP <br />Height from Tank Top to Top of 12" <br />Highest Piping Penetration: <br />20" <br />38" <br />Height from Tank Top to Lowest 18" <br />Electrical Penetration: <br />20" <br />27" <br />Condition of sump prior to testing: OK <br />OK <br />OK <br />Portion of Sump Tested' 2" above highest pipe pen <br />2" above highest pipe pen <br />2" above highest pipe pen <br />Does turbine shut down when <br />sump sensor detects liquid (both ❑Yes ❑No ® NA <br />product and water)? * <br />®Yes ❑No ® NA <br />❑Yes ❑No® NA <br />❑Yes [-]No ❑ NA <br />Turbine shutdown response time <br />Is system programmed for fail-safe <br />❑ <br />shutdown?* Yes ❑No ®NA <br />❑Yes ❑No ®NA <br />[-]Yes❑No ®NA <br />[:]Yes[-]No❑NA <br />Was fail-safe verified to be <br />operational?* ❑Yes []No ®NA <br />❑Yes ❑No ®NA <br />[-]Yes[:]No ®NA <br />❑Yes ❑No ❑NA <br />Wait time between applying <br />pressure/vacuum/water and starting 15 Minutes <br />test: <br />15 Minutes <br />15 Minutes <br />Test Start Time: 10:27 <br />10:43 <br />1:14 1:29 <br />12:57 1:15 <br />Initial Reading (RI): 4.6587 <br />4.6584 <br />3.8847 3.8845 <br />6.7799 6.7795 <br />Test End Time: 10:42 <br />10:58 <br />1:29 1:44 <br />1:12 1:30 <br />Final Reading (RF): 4.6584 <br />1 4.6585 <br />3.8844 1 3.8844 <br />6.7794 1 6.7777 <br />Test Duration: 15 Min Each(30)min <br />15 Min Each(30)min <br />15 Min Each(30)min <br />Change in Reading (RF -RI): 0.0003 F 0.0001 <br />0.0003 0.0001 <br />0.00051 0.0018 <br />Pass/Fail Threshold or Criteria: +/- 0.002" <br />+/- 0.002" <br />+/- 0.002" <br />Test Result: ® Pass ❑ Fail <br />® Pass ❑ Fail <br />® Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Was sensor removed for testing? ®Yes ❑No [_]NA <br />®Yes [:]No [:]NA <br />®Yes ❑No ❑NA <br />❑Yes [:]No ❑NA <br />Was sensor properly replaced =andZverified functional after lacedtestinYes ❑No ❑NA <br />®Yes [:]No ❑NA <br />®Yes ❑No ❑NA <br />❑Yes ❑No ❑NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to an of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />