Laserfiche WebLink
El <br />SWRCB, January 2002 <br />E <br />Page 5 of 7 <br />7. UNDER -DISPENSER CONTAINMENT UDC TESTING <br />Test Method Developed By: ❑ UDC Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ vacuum ® Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used:Incon TS -STS Equipment Resolution:+/ -0.0001" <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />UDC #28 Main <br />UDC #28 <br />UDC #29 Main <br />UDC #29 Sat <br />UDC Manufacturer: <br />Western Fiberglass <br />Western Fiberglass <br />Western Fiberglass <br />Western Fiberglass <br />UDC Material: <br />FRP <br />FRP <br />FRP <br />FRP <br />UDC Depth: <br />31" <br />31" <br />31" <br />31" <br />Height from UDC Bottom to Top <br />9" <br />9" <br />9" <br />9" <br />of Highest Piping Penetration: <br />Height from UDC Bottom to <br />6" <br />6" <br />6" <br />6" <br />Lowest Electrical Penetration: <br />Condition of UDC prior to <br />OK <br />OK <br />OK <br />OK <br />testing: <br />Portion of UDC Tested <br />2"above highest Pipe pen <br />2"above highest Pipe pen <br />2"above highest Pipe pen <br />2"above highest Pipe pen <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />❑Yes ❑No ®NA <br />❑Yes ❑No ®NA <br />❑Yes ❑No ®NA <br />❑Yes ❑No ®NA <br />product and water)?* <br />Turbine shutdown response time <br />N/A <br />N/A <br />N/A <br />N/A <br />Is system programmed for fail- <br />®Yes [:]No ®NA <br />❑Yes ❑No ®NA <br />[-]Yes❑No ®NA <br />❑Yes []No ®NA <br />safe shutdown?* <br />Was fail-safe verified to be <br />®yes ❑No ®NA <br />❑Yes ❑No ®NA <br />[:]Yes[ -]No ®NA <br />❑Yes ONo ®NA <br />operational?* <br />Wait time between applying <br />pressure/vacuum/water and <br />15 Minutes <br />15 Minutes <br />15 Minutes <br />15 Minutes <br />starting test <br />Test Start Time: <br />3:41 4:25 <br />3:41 4:25 <br />3:50 4:06 <br />3:50 4:06 <br />Initial Reading (RI): <br />7.0953 7.0966 <br />6.5952 6.6286 <br />3.1021 3.1019 <br />2.8205 2.8209 <br />Test End Time: <br />3:57 4:40 <br />3:57 4:40 <br />4:05 4:21 <br />4:05 4:21 <br />Final Reading (RF): <br />7.0960 7.0967 <br />6.5971 6.6280 <br />3.1021 3.1015 <br />2.8207 2.8207 <br />Test Duration: <br />15 Min Each (30 Min) <br />15 Min Each (30 Min <br />15 Min Each (30 Min) <br />15 Min Each Q0 Min) <br />Change in Reading (RF -RI): <br />0.0007 1 0.0001 <br />0.0019 1 0.0006 <br />0.0000 10.0004 <br />0.0002 0.0002 <br />Pass/Fail Threshold or Criteria: <br />+/- 0.002" <br />+/- 0.002" <br />+/- 0.002" <br />+/- 0.002" <br />Test Result: <br />® Pass ❑ Fail <br />® Pass ❑ Fail <br />® Pass ❑ Fail <br />® Pass ❑ Fail <br />Was sensor removed for testing? <br />NYes 0No nNA <br />®Yes No NA <br />®Yes No NA <br />®Yes EINo ❑NA <br />Was sensor properly replaced and <br />®Yes ❑No ❑NA <br />®Yes ❑No �N:A=s <br />❑No ❑NA <br />®Yes ❑No ❑NA <br />verified functional after testin ? <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />