Laserfiche WebLink
SWRCB, January 2002 Page 7 of 7 <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: ❑ Spill Bucket Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used:Incon TS-STS <br />Equipment Resolution:+/- 0.0001" <br />ket Diameter: <br />Spill Box #T-1Fill Spill Box #T-2Fill <br />18" 18" <br />Spill Box #T-3Fill Spill Box # <br />18" <br />ket Depth: <br />7startingg <br />13" 13" <br />13" <br />t time between applying <br />sure/vacuum/water and <br />test: <br />15 Minutes 15 Minutes <br />15 Minutes <br />Test Start Time: <br />8:43---8:27 8:43 <br />8:43 <br />Initial Reading (RI): <br />3.3187---3.3188 3.4127---3.4130 <br />4.9371---4.9380 <br />Test End Time: <br />8:58 8:58 <br />8:58 <br />Final Reading (RF): <br />3.3188---3.3188 3.4126---3.4127 <br />4.9377---4.9371 <br />Test Duration: <br />15 Min Ea(30 Min) 15 Min Ea(30 Min) <br />15 Min Ea(30 Min) <br />Change in Reading (RF-RI): <br />0.0001---0.0000 0.0001---0.0003 <br />0.0006---0.0009 <br />Pass/Fail Threshold or <br />Criteria: <br />+/- 0.002" +/-0.002" <br />+/- 0.002" <br />Test Result: ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />