Laserfiche WebLink
SWRCB, January 2002 Page 7 of 7 <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: ❑ Spill Bucket Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used:Incon TS-STS <br />Equipment Resolution:+/- 0.0001" <br />Spill Box #T-4Fill Spill Box #T-4Vapor <br />Spill Box #T-5Fill Spill Box #T5Vapor <br />Mfime7alplplyingg <br />11" 11" <br />11" 11" <br />11" 11" <br />11" 11" <br />pressure/vacuum/water and <br />starting test: <br />15 Minutes 15 Minutes <br />15 Minutes 15 Minutes <br />Test Start Time: <br />9:24 9:24 <br />10:27 9:24 <br />Initial Reading (RI): <br />4.8136---4.8132 6.4596---6.4595 <br />6.5490---6.5404 6.3934---6.3946 <br />Test End Time: <br />9:36 9:39 <br />10:42 9:39 <br />Final Reading (RF): <br />4.8134---4.8134 6.4595---6.4596 <br />6.6584---6.5233 6.3933---6.3943 <br />Test Duration: <br />15 Min Ea(30 Min) 15 Min Ea(30 Min) <br />15 Min Ea(30 Min) 15 Min Ea(30 Min) <br />Change in Reading (RF-RI): <br />0.0002---0.0002 0.0001---0.0001 <br />0.0794---0.0171 0.0001---0.0003 <br />Pass/Fail Threshold or <br />Criteria: <br />+/- 0.002° +/- 0.002^ <br />+/- 0.002° +/- 0.002" <br />Test Result: ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ® Fail ® Pass []Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Tank # 5 Phil-Tite Fill bucket failed hydrostatic test. <br />