Laserfiche WebLink
E <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: F piping Manufacturer F Industry Standard F Professional Engineer <br />F Other(Specify) <br />Test Method Used: Pressure Vacuum Hydrostatic <br />F Other(Specify) <br />Test Equipment Used: 4" dial gauge Equipment Resolution: .2 <br />SEEMEM <br />Piping Run <br />supply UG01 OU001 <br />Piping Run <br />Return UG010U001 <br />Piping Run <br />Vent UG010 U001 <br />Piping Run <br />Piping Material: <br />Poly <br />Poly <br />Fiberglass <br />Piping Manufacturer: <br />Western F iberg lass <br />We stern F iberg lass <br />AO Smith <br />Piping Diameter: <br />.75" <br />1.00" <br />3" <br />Length of Piping Run: <br />30' <br />30' <br />8' <br />Product Stored: <br />Diesel <br />Diesel <br />Diesel <br />Method and location of piping -run <br />isolation: <br />Test Boot <br />Test Boot <br />Test Boot <br />Wait time between applying <br />pressure/vacuum/waterand <br />starting test: <br />15 min <br />15 min <br />15 min <br />Test Start Time: <br />9:15 am <br />9:15 am <br />9:15 am <br />Initial Reading (Rt): <br />5 psi <br />5 psi <br />5 psi <br />Test End Time: <br />10:15 am <br />10:15 am <br />10:15 am <br />Final Reading (RF): <br />5 psi <br />5 psi <br />5 psi <br />Test Duration: <br />1 hour <br />1 hour <br />1 hour <br />Change in Reading (RF -R1): <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />0 <br />0 <br />0 <br />Test Result: <br />F Pass F Fail <br />F Pass F Fail <br />F Pass F Fail <br />F Pass r Fail <br />Comments —(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />