Laserfiche WebLink
6. PIPING SUMP TESTING <br />Test Method Developed By: F Sump Manufacturer F Industry Standard F Professional Engineer <br />F Other(Specify) <br />Test Method Used: F Pressure F Vacuum F Hydrostatic <br />F Other(Specify) <br />Test Equipment Used: Incon TS ST^S Equipment Resolution: .0006 <br />COmments — (include information on repairs made prior to testing, and recommendedfollow-up for failed tests) <br />Reinstall sensors at lowest point but not tested. <br />(1) Ifthe entire depth of the sump is not tested, specify how much was tested. Ifthe answer to any of the questions indicated <br />with an asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />Sump <br />Sump Sump <br />Sump <br />111MEMM <br />Piping/FillUG010U001 <br />Vent Trans. UG010U001 Piping Trns. UG0100001 <br />Sump Diameter: <br />48" <br />26"x18" 28"x28" <br />Sump Depth: <br />60" <br />36" 36" <br />Sump Material: <br />Fiberglass <br />Fiberglass Fiberglass <br />Height from Tank Top to Top of <br />24" <br />14" 14" <br />Highest Piping Penetration: <br />Height from Tank Top to Lowest <br />18" <br />27„ 27„ <br />Electrical Penetration: <br />Condition of sump prior to <br />Good <br />Good Good <br />testing : <br />Portion of Sump Tested (1) <br />2" above piping <br />2" above piping 2" above piping <br />Does turbine shutdown when <br />sump sensor detects liquid (both <br />F Yes r No IV NA <br />- r� � <br />r <br />P Yes I No F0 NA 1 Yes i No 1- NA <br />r � <br />I <br />I Yes No r NA <br />product and water)?* <br />Turbine shutdown response time <br />N/A <br />N/A N/A <br />Is system programmed for fail- <br />Yes r No !_ NA <br />I Yes ! NolT NA Yes No 0_ NA <br />F Yes F No F NA <br />safe shutdown?* <br />Was fail-safe verified to be <br />F Yes F NoF NA <br />F Yes No NA F Yes 1 No NA <br />F Yes F No F NA <br />operational?* <br />Wait time between applying <br />pressure/vacuum/water and <br />15 min <br />15 min 15 min <br />starting test: <br />Test Start Time. <br />9:44 am 10:00 am <br />9:44 am 10:00 am 9:44 am 10:00 am <br />Initial Reading (Rl): <br />5.8281 5.8279 <br />2.9989 2.9986 6.2582 6.2593 <br />Test End Time: <br />9:59 am 10:15 am <br />9:59 am 10:15 am 9:59 am 10:15 am <br />Final Reading (RF): <br />5.8281 5.8278 <br />2.9988 2.9985 6.2586 6.2593 <br />Test Duration: <br />15 min 115 min <br />15 min 115 min 15 min 15 min <br />Change in Reading (RF Rl): <br />0 .0001 <br />.0001 .0001 .0004 0 <br />Pass/FaiI Threshold or Criteria: <br />.002 .002 <br />.002 1.002 .002 1.002 <br />Test Result: <br />F Pass F Fail <br />Pass F Fail Pass Fail <br />F Pass Fail <br />Was sensor removed for testing? <br />1� Y. No F NA <br />� <br />�' Yes F No F NA FY. F No NA <br />Yes Nor— NA <br />Was sensor properly replaced and <br />F <br />Yes No NA <br />Yes No NA Yes No NA <br />F <br />Yes No NA <br />Venfied functional after testing? <br />COmments — (include information on repairs made prior to testing, and recommendedfollow-up for failed tests) <br />Reinstall sensors at lowest point but not tested. <br />(1) Ifthe entire depth of the sump is not tested, specify how much was tested. Ifthe answer to any of the questions indicated <br />with an asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />