Laserfiche WebLink
' SWRCB,January 2002 Page of <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer Xjndustry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum ydrostatic <br /> ❑Other(Specie) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box# Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter: /Zoe r /Z ` /z /Z ?'r <br /> Bucket Depth: jjp° < fil !r j�`P1,6 <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(Rj): <br /> Test End Time: 02,' „�,'/S jQa?°y�" .' <br /> Final Reading(RF): /Z� r /�,°r //°,,S--°• y r Jar° S— <br /> Test Duration: ,/ <br /> Change in Reading(RF-R,): Q Q <br /> Pass/Fail Threshold or <br /> Criteria: �DdZ er '5 <br /> Test ResulPass ❑Fail ,Pass ❑Fail ❑ Pass ❑Fail ❑ Pass <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> r <br />