Laserfiche WebLink
Alk <br />SAN JOA COUNTY ENVIRONMENTAL HEALTH PARTMENT <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - PAGE 1 <br />TYPE OF ACTION ❑ 1. NEW PLAN ❑ 2. CHANGE OF INFORMATION <br />Mol. <br />PLAN TYPE ❑ MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br />M02. <br />(Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br />I. FACILITY INFORMATION <br />FACILITY ID # (Agency Use Only) <br />FACILITY NAME <;J4 f --L L 1 _ <br />M03. <br />FACILITY SITE ADDRESS'P -71 7 t,i) { M04.CITY <br />Mos. <br />H. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br />State law requires that testing, preventive maintenance, and calibration of monitoring equipment (e.g., sensors, probes, line leak detectors, etc.) be performed in <br />MO <br />accordance with the equipment manufacturers' instructions, or annually, whichever is more frequent. Such work must be performed by qualified personnel. <br />MONITORING EQUIPMENT IS SERVICED . ANNUALLY 99. OTHER (Specify): <br />MOT <br />III. MONITORING LOCATIONS <br />This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed (i.e., location of each sensor, <br />line leak detector, monitoring system control panel, etc.). Ifyou already have a diagram (e.g., current UST Monitoring Site Plan from a Monitoring System Certification <br />form, Hazardous Materials Business Plan map, etc.) which shows all required information,include it with this plan. <br />IV. TANK MONITORING <br />MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): (Check all that apply) <br />Mlo. <br />1. CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT VAULT(S) <br />SECONDARY CONTAINMENT IS: ❑ a. DRY V b. LIQUID FILLED ❑ c. UNDER PRESSURE ❑ d. UNDER VACUUM <br />Mn. <br />PANEL MANUFACTURER: \% 1412. MODEL #: L S `'> (-) <br />M13. <br />LEAK SENSOR MANUFACTURER: V '=P -C " Mla. MODEL #(S): %G LF -.2, E� '- ZG� <br />1415. <br />❑ 2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANK(S) <br />PANEL MANUFACTURER: M16. MODEL #: <br />MIT <br />IN -TANK PROBE MANUFACTURER: M18- MODEL #(S): <br />M19. <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS ❑ b. DAILY/NIGHTLY ❑ c. WEEKLY <br />M20. <br />❑ d. MONTHLY ❑ e. OTHER (Specify): M21. <br />PROGRAMMED TESTS: ❑ a. 0.1g.P.h. ❑ b. 0.2 g.p.h. c. OTHER (SP� (Specify): M22. <br />M23. <br />❑ 3. INVENTORY RECONCILIATION ❑ a. MANUAL PER 23 CCR §2646 ❑ b. STATISTICAL PER 23 CCR §2646.1 <br />M24. <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) PER 23 CCR §2645 <br />TESTING PERIOD: ❑ a. 36 HOURS ❑ b. 60 HOURS <br />M25. <br />❑ 5. INTEGRITY TESTING PER 23 CCR §2643.1 <br />TEST FREQUENCY: ❑ a. ANNUALLY ❑ b. BIENNIALLY ❑ c. OTHER (Specify): M26. <br />M2z <br />❑ 6.VISUAL MONITORING DONE: ❑ a. DAILY ❑ b. WEEKLY (Requires agency approval) <br />❑ 99. OTHER (Specify): <br />Meg. <br />V. PIPE MONITORING <br />MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) <br />Mao. <br />1. CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(SyrRENCH(ES) AND OTHER SECONDARY CONTAINMENT <br />SECONDARY CONTAINMENT IS: >'a. DRY ❑ b. LIljUID FILLED ❑ c. UNDER PRESSURE ❑ d. UNDER VACUUM <br />M31. <br />PANEL MANUFACTURER: V e-R-� � 'i 1432. MODEL #: --r - S - 3 .s- U <br />M33. <br />LEAK SENSOR MANUFACTURER: UL lZ cb^ 'R 2% i- M34. MODEL #(S): % c"1 4- 3 0 0 - Z 0 <br />M35. <br />WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN? X, a. YES ❑ b. NO <br />M36. <br />WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? g a. YES ❑ b. NO <br />M37. <br />MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS <br />OFF <br />PRODUCT FLOW WHEN A LEAK IS DETECTED <br />L ( Mag. SrzP, <br />M39. <br />MLLD MANUFACTURER(s): :* S22. e o w MODEL #(S): 9 , x=-10 VAJ <br />C]3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS <br />ELLD MANUFACTURER: M40. MODEL #: <br />M41. <br />PROGRAMMED LINE INTEGRITY TESTS: ❑ a. MINIMUM MONTHLY 0.2 g.p.h. ❑ b. MINIMUM ANNUAL 0.1 g.p.h. <br />M42. <br />WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES ❑ b. NO <br />M43. <br />WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES ❑ b. NO <br />M44. <br />❑ 4, INTEGRITY TESTING <br />TEST FREQUENCY: ❑ a. ANNUALLY ❑ b. EVERY 3 YEARS ❑ c. OTHER (Specify) Mas. <br />M46. <br />❑ 5. VISUAL MONITORING DONE: ❑ a. DAILY ❑ b. WEEKLY* ❑ C. MIN. MONTHLY & EACH TIME SYSTEM OPERATED" <br />M47. <br />• Requires agency approval •• Allowed for nmaitoring of unburied emergency generator fuel piping only per HSC 125281.5(b)(3) <br />❑ 6. PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR §2636(ax3) <br />❑ 7. NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br />❑ 99. OTHER (Specify) <br />M48. <br />SICEHD-d (07/03) -1/4 e-7 ` V C -r o✓' l"r ) (_V M l ) <br />y 1 ". Ue;,Lvomn. � CV M <br />D1tStt,( � vim' tk-- j2-0e)f FX <br />l,P 2-000 <br />L D "?moo <br />DV <br />07/23/03 <br />