Laserfiche WebLink
UNDERGROUND STORAGE TANK <br />MONITORING PLAN - PAGE <br />VI. DISPENSER MONITORING <br />MONITORING OF AREAS BENEATH DISPENSER(S) IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) M50. <br />1. CONTINUOUS ELECTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT (UDC) <br />M51 TL - E O M52. <br />MODEL #: -5- <br />PANEL MANUFACTURER: V 0 "1 <br />LEAK SENSOR MANUFACTURER: Vz- e-tQ L Mss. MODEL #(S): 7q43,80— 63 M54. <br />WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? [ a. YES ❑ In. NO Mss. <br />WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? a. YES ❑ b. NO M56. <br />WILL FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? . YES ❑ b. NO M57. <br />❑ 2. MECHANICAL ASSEMBLY (e.g., FLOAT AND CHAIN ASSEMBLY) IN UDC TRIPS SHEAR VALVE IN CASE OF LEAK <br />ASSEMBLY MANUFACTURER: M5S MODEL #(S): Mss. <br />❑ 3. VISUAL MONITORING DONE: ❑ a. DAILY ❑ b. WEEKLY (Requires agency approval) M60. <br />❑ 4. NO DISPENSERS <br />❑ 99. OTHER (Specify) M6L <br />VII. ENHANCED LEAK DETECTION <br />❑ 1. WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENHANCED LEAK M70 <br />DETECTION (ELD) FOR THE UST(S) COVERED BY THIS PLAN. PER 23 CCR §2644.1, ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br />VIII. TRAINING <br />REFERENCE DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) Mao. <br />1. THIS UNDERGROUND STORAGE TANK MONITORING PLAN (Required) <br />2. OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) <br />3. THE FACILITY'S BEST MANAGEMENT PRACTICES (Required as of 1/01/2005) <br />4. CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br />5. ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br />6. ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br />STATISTICAL INVENTORY RECONCILIATION" <br />7. ❑ SWRCB PUBLICATION: "WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br />99. ❑ OTHER (Specify): Msl <br />Personnel with UST monitoring responsibilities are familiar with all of the above documents relevant to their job duties and can access those documents when needed. <br />By January 1, 2005 this facility will have a "Designated USTOperator" who has passed the operator exam administered by the International Code Council (ICC). By <br />January 1, 2005, and annually thereafter, the "Designated UST Operator" will train facility employees in the proper operation and maintenance of the UST systems. <br />This training will include, but is not limited to, the following: <br />➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br />➢ The facility employee's role with regard to the leak detection equipment. <br />The facility employee's role with regard to spills and overfills. <br />Whom to contact for emergencies and leak detection alarms. <br />For facility employees hired on or after January 1, 2005, the initial training will be conducted within 30 days of the date of hire. <br />IX. COMMENTS/ADDITIONAL INFORMATION <br />dditional UST system monitoring -related information(e.g.,yadditional infpoyrm�ation required by�your agency): Mss. <br />Please section topiynclude any additional <br />/uusy]e'this local <br />$ <br />vi S o- 0 X11' <br />X. PE ONNEL RESPONSIBILITIES <br />AS OF 1/1/05, THE "DESIGNATED UST OPERATOR" IDENTIFIED IN SECTION III OF THE CURRENT UST OPERATING PERMIT APPLICATION - <br />FACILITY FORM WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING LEAK DETECTION <br />EQUIPMENT COVERED BY THIS PLAN, AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OF THE FACILITY'S <br />UST SYSTEMS IN ACCORDANCE WITH 23 CCR § 2715(b). <br />XL OWNER/OPERATOR SIGNAT <br />CERTIFICATION: I certify that the information provided herein is true and accurate to the best of my knowledge. <br />OWNER/OPARATOR SIGNATURE REPRESENTING <br />DATE: M91. <br />❑ Owner M9o. <br />❑ Operator <br />0!�/ + Lo <br />OWNER/OPERATOR N (print): M92. OWNER/OPERATOR TITLE: Mss. <br />'Joe. <br />(Agency Use Only) This plan has been reviewed and 0 Approved ❑ Approved With Conditions DisapproXed <br />Local Agency Signature: Date: <br />Comments/Special Conditio <br />SJCEHD-d (07/03) - 3/4 07/23/03 <br />