Laserfiche WebLink
TOR - - - -- <br /> 3.0 SCHEDULE AND REPORTING <br /> 3.1 Reporting <br /> Upon completion of the work proposed herein, SECOR will prepare a report summarizing field <br /> activities and analytical results of the investigation. The report will be submitted to the <br /> CRWQCB and will include tabulated field and analytical data; figures depicting subsurface <br /> conditions including soil and groundwater chemical analytical results; and appendices <br /> containing laboratory reports, well completion and soil boring logs, and copies of field notes and <br /> data sheets. The report will also include conclusions and recommendations for further work, if <br /> warranted. <br /> 3.2 Schedule <br /> SECOR is prepared to initiate pre-field activities including subcontractor selection and <br /> scheduling immediately following approval of this work plan by the CRWQCB. Field activities <br /> will begin after site access has been secured and following the receipt of valid well installation <br /> permits from San Joaquin County Environmental Health Department (SJCEHD). SECOR <br /> anticipates completion of the field activities in early summer 2008. The report summarizing field <br /> activities and analytical results of the investigation will be submitted approximately 6 weeks after <br /> completion of field activities and receipt of laboratory data. <br /> Additional Deep Zone Assessment Work Plan.final.doc <br /> Tidewater Stockton <br /> March 14,2008 <br /> 7 <br />