Laserfiche WebLink
S E C O R <br /> 4.0 LIMITATIONS <br /> This work plan was prepared in accordance with the scope of work outlined in SECOR's contract <br /> and with generally accepted professional engineering and environmental consulting practices <br /> existing at the time this report was prepared and applicable to the location of the Site. It was <br /> prepared for the exclusive use of CEMC and COP, for the express purpose stated above. Any re- <br /> use of this work plan for a different purpose or by others not identified above shall be at the user's <br /> sole risk without liability to SECOR. To the extent that this work plan is based on information <br /> provided to SECOR by third parties, SECOR may have made efforts to verify this third party <br /> information, but SECOR cannot guarantee the completeness or accuracy of this information. The <br /> opinions expressed and data presented are based on the conditions of the site existing at the time <br /> of that field investigation. SECOR assumes no responsibility for exploratory borings or data <br /> reported by other consultants or contractors. No other warranties, expressed or implied are made <br /> by SECOR. <br /> Additional Deep Zone Assessment Work Plan.final.doc <br /> Tidewater Stockton <br /> March 14,2008 <br /> 8 <br />