Laserfiche WebLink
29 May 2020 AdvancedGeo <br /> An Employee-Owned Company <br /> Project No. 20-6014 <br /> Page 14 of 14 <br /> • The nitrogen loading rate is above the desired value of 10 ppm. However, the <br /> groundwater table is currently 75 feet bsg and has fluctuated between 70 and 115 <br /> feet bsg over the past decade. It's unlikely that nitrates from the proposed septic <br /> system will impact the groundwater aquifer beneath the site. <br /> • The out-of-service domestic well at the property may have to be relocated to <br /> comply with the EHD Onsite Wastewater Treatment System Standards <br /> • All approved septic system use should follow the EHD Onsite Wastewater <br /> Treatment System Standards. <br /> 13.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily <br /> exercised by environmental consultants practicing in this or similar localities. The findings <br /> were based on field testing results. Evaluations of the hydrogeologic conditions at the site <br /> for the purpose of this investigation were made from a limited number of available data <br /> points (i.e. test hole and field data) and subsurface conditions may vary away from these <br /> data points. No other warranty, expressed or implied, is made as to the professional <br /> interpretations, opinions and recommendations contained in this report. <br />