My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0082156 SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON
>
1901
>
2600 - Land Use Program
>
SR0082156 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2020 10:25:46 AM
Creation date
6/25/2020 9:26:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SR0082156
PE
2602
FACILITY_NAME
1901 PATTERSON AVE STOCKTON CA
STREET_NUMBER
1901
STREET_NAME
PATTERSON
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
08909108
ENTERED_DATE
6/4/2020 12:00:00 AM
SITE_LOCATION
1901 PATTERSON AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
29 May 2020 AdvancedGeo <br /> Project No. 20-6014 An Employee Owned Company <br /> Page 13 of 14 � <br /> 9.7. IMPACT OF NITROGEN LOADING FROM SITE PROJECT TO <br /> DOWNGRADIENT WATER SOURCES <br /> The recharging of groundwater is the most likely potential feature that could impact future <br /> nitrogen loading. Since the subject property is flat, AGI does not anticipate percolating <br /> effluent will affect any nearby water sources. Based on the volume of wastewater to be <br /> generated and the depth to groundwater (75 feet bsg), the potential vertical migration <br /> would not likely degrade the local groundwater. A total of 18.50 ppm of additional nitrogen <br /> is estimated to be added to the site over the long term through wastewater recharge from <br /> the proposed septic system. The nitrogen loading value is above the desired value of 10 <br /> ppm. <br /> 10.0. TOTAL NITRATE IMPACT FROM PROPOSED PROJECT <br /> Based on the method and assumptions described, proposed NO3_N mass of wastewater <br /> and the calculations of the NO3_N loading predicted, the proposed development may <br /> negatively impact NO3_N loading rates within the aquifer. The soil at the site appear to <br /> be adequate for nitrate degradation and proper leaching of wastewater. A total of <br /> 18.50 ppm of additional nitrogen is estimated to be added to the site over the long term <br /> through wastewater recharge from the proposed septic system. <br /> 11.0. MITIGATION METHODS PROPOSED <br /> To mitigate any known or potential future impacts of nitrate to soil and groundwater from <br /> the proposed septic system, the following mitigations could be implemented: <br /> • Maximize wastewater hold time where practical (retention). <br /> • Avoid use of bioattenuation chemicals (bleach etc.). <br /> • Properly and regularly maintain the property septic system. <br /> • Use EHD criteria for sizing the septic disposal field. <br /> If re-location or expansion of leach fields becomes necessary, leach lines should include <br /> high organic substrates under and surrounding the lines installed. <br /> 12.0. CONCLUSIONS AND RECOMMENDATIONS <br /> Based on this Soil Suitability and Nitrate Loading Study, AGI concludes the following: <br /> • The percolation rate meets the minimum EHD standards in the proposed septic <br /> system disposal field. <br />
The URL can be used to link to this page
Your browser does not support the video tag.