Laserfiche WebLink
©2020 STARBUCKS COFFEE COMPANY <br /> 0 <br /> STARBUCKS° <br /> 2401 UTAH AVENUE SOUTH <br /> J SEATTLE, WASHINGTON 98134 <br /> (206) 318-1575 <br /> 05 ALL GENDER / nH <br /> RESTROOM THESE DRAWINGS AND THE PROJECT MANUAL <br /> ARE CONFIDENTIAL AND SHALL REMAIN THE <br /> SOLE PROPERTY OF STARBUCKS <br /> ' C x18859 - CORPORATION, WHICH IS THE OWNER OF THE <br /> C x18860 01 CAFE COPYRIGHT IN THIS WORK. THEY SHALL NOT <br /> C 21946 BE REPRODUCED (IN WHOLE OR IN PART), <br /> C 21x47 SHARED WITH THIRD PARTIES OR USED IN ANY <br /> \ C 17744 EXTENSIONS <br /> ON OTHER PROJECTS OR <br /> IF TO THIS PROJECT WITHOUT THE <br /> ^----------------- — — \ _ PRIOR WRITTEN CONSENT OF STARBUCKS <br /> i o O / CORPORATION. THESE DRAWINGS AND <br /> �/ >\ \\ 1 \ // �\ G 18984 (7) SPECIFICATIONS ARE INTENDED TO EXPRESS <br /> 1_7LO 06 ALL GENDER <br /> 1 �^ \ ' \ 1 \ // \ \\ i G 19549 (6> DESIGN INTENT FOR A PROTOTYPICAL <br /> STARBUCKS STORE (WHICH IS SUBJECT TO <br /> � \ J G 19880 CHANGE AT ANYTIME) AND DO NOT REFLECT <br /> 1 v <br /> \ \ //1 \\ C X1189 / \\ ACTUAL SITE CONDITIONS. NEITHER PARTY <br /> � (, 21189 (4) � // /� \\ <br /> � 1 O \ � I \_/ / \ � SHALL HAVE ANY OBLIGATION NOR LIABILITY TO <br /> THE OTHER (EXCEPT STATED ABOVE) UNTIL A <br /> 1 O \� \\ a• \ \\\ > WRITTEN AGREEMENT IS FULLY EXECUTED BY <br /> BOTH PARTIES. <br /> 1 \\ 1 <br /> N I �\ \ C 20052 N C 17580 \ <br /> No 1 C 17740 C 18720 � C xlass3 STARBUCKS TEMPLATE VERSION: 12020.10.23 <br /> \ \ 1 \ <br /> ; <br /> r C 17741 C 19712 \� 1 \\ /— <br /> (\I \\ 1 /// \ C X18854 !�. \ <br /> I C 17745 C 17809 TYPICAL ON. � <br /> C 17747 C 17574 (2) x\ i �> ° \ THROUGHOUT O° , val <br /> • and interiors <br /> architecture <br /> N V�® 0 <br /> 02 ENGINE\ 1 I C 21190 N ; \\\\ 858 Wilshire Blvd #200 T: 323.954.8996 <br /> Q ---- <br /> �`___ ______________ _ ___�� I I C X19330 C 17580 0•• \�\�\ os Angeles, CA 90036 F: 323.954.8965 <br /> 03 BOH C 21191 \\\\\ — ww.valerioinc.com * info@valerioinc.com <br /> I \ \ <br /> O I I Ij o I I <br /> � 03 I � I it Iiio C 111 ss C x20083 <br /> C 20062 C 19281 (2) <br /> vvv C.) LO V <br /> C X20067 C 21193 (2) C \\\ COqL� r� <br /> N LIC.NO. <br /> U I I II II I C X20066 C 18145 , ,O, \\\ (� 2 O n <br /> C 24228 <br /> Q I I II I \\\ EXPIRES y <br /> I I I <br /> \ � 7-31-21 <br /> J I I III — <br /> r) O I I I� oII I � � 9�OFca��'O4� <br /> U I I I II I <br /> 1 1 II I I i <br /> N 1 1 5 I L— <br /> in I j 0 <br /> CD <br /> 6 <br /> ---- <br /> N <br /> i <br /> rr <br /> (z <br /> �I 02 Q <br /> 1102 <br /> 06 L� <br /> �I � rZ <br /> �I 06 Q O <br /> w 01 CASEWORK PLAN 02 UPPER CASEWORK PLAN- ENGINE 03 UPPER CASEWORK PLAN- ENGINE 2 w a <br /> UI SCALE: 1/4" = V-0" SCALE: 1/2" = V-0" SCALE: 1/2" = V-0" J (w F--- <br /> U z <br /> X' o —: 0 <br /> U) z Q Q <br /> T O <br /> r U 1 U C\1 <br /> o 0 0 0 (o O Q <br /> °' LU C!) C!) <br /> N <br /> STORE #: 9287 <br /> GENERAL NOTES KEYED NOTES LEGEND PROJECT #: 23544-077 <br /> 11 <br /> 0 ISSUE DATE: 03-12-21 <br /> NDESIGN MANAGER: JESSICA RAMOS <br /> N A. GENERAL CONTRACTOR TO NOTIFY CONSTRUCTION MANAGER IMMEDIATELY E. ALL CASEWORK BOX BASE/TOE KICKS SHALL BE SET AND LEVELED USING 1. DO NOT CAULK TRASH RINGS TO COUNTERTOPS. INDICATES STAINLESS STEEL (SST) COUNTERTOP <br /> (n IF A DISCREPANCY EXISTS BETWEEN CASEWORK SHOP DRAWINGS, EXITING 1/4" (6 MM) NON-ABSORBENT PLASTIC SHIMS PROVIDED BY CASEWORK <br /> SITE CONDITIONS, ARCHITECTURAL DRAWINGS OR BUILT FIXTURES. ALL VENDOR. 2. INSTALL CASEWORK, COUNTERTOPS, SHELVES, CUBBIES, FINISHES, TRIM CHECKED BY: LILY JUMANAN <br /> O DIMENSIONS SHALL BE FIELD VERIFIED BY GC PRIOR TO SHOP DRAWINGS AND TABLE TOPS THROUGHOUT. REFERENCE FINISH SCHEDULE AND INDICATES SOLID SURFACE (SS) COUNTERTOP <br /> l—. PRODUCTION. F. SEE INTERIOR FINISH ELEVATIONS AND SCHEDULES FOR LOCATION AND MANUFACTURER'S SPECIFICATIONS FOR ADDITIONAL INFORMATION. Revision Schedule <br /> TAGGING OF WALL TREATMENTS BY CV AND OTHERS. <br /> Q B. STARBUCKS CONSTRUCTION MANAGER TO COORDINATE AND SCHEDULE 3. ALL COUNTERTOPS UTILIZED FOR CUSTOMER TRANSACTIONS, INCLUDING INDICATES RELOCATED CASEWORK ITEM <br /> By Description <br /> CASEWORK DELIVERY DATE. GENERAL CONTRACTOR TO CONFIRM G. SEE REFLECTED CEILING PLAN FOR CASEWORK SOFFIT LOCATIONS. BAR, CONDIMENT AND SALES COUNTERTOPS SHALL BE INSTALLED AT 2'-10" 02 Rev Date ate WY CHECK SET <br /> CASEWORK DELIVERY DATE WITH CASEWORK MANUFACTURER AT FOUR (4) (860 MM) MAXIMUM A.F.F. INDICATES EXISTING ITEM TO REMAIN 03-12 21 WY PERMIT SET <br /> WEEKS PRIOR AND THEN ONE (1) WEEK PRIOR TO SCHEDULED DATE OF H. REFERENCE PLUMBING AND ELECTRICAL PLANS FOR PLACEMENT OF <br /> DELIVERY. ELECTRICAL, DATA AND PLUMBING ON FRONT AND BACKLINE OF BAR. 4. VARIABLE WIDTH FILLER CABINET/COUNTERTOP REQUIRED TO FILL GAP <br /> (FIELD VERIFY DIMENSION). VENDOR TO COORDINATE EXACT DIMENSION <br /> C. STARBUCKS CONTRACTS DIRECTLY WITH CASEWORK VENDOR TO SUPPLY I. PROVIDE ACCENT LIGHTING AT FRONT EDGE OF BAR. SEE INTERIOR WITH GC PRIOR TO INSTALLATION. <br /> CASEWORK LISTED IN THE CASEWORK SCHEDULE, UNLESS OTHERWISE ELEVATIONS AND ELECTRICAL FOR ADDITIONAL INFORMATION. <br /> NOTED. 5. FLOOR SINK BELOW. CASEWORK MANUFACTURER TO COORDINATE SHEET TITLE: <br /> 75 J. CASEWORK VENDOR TO ENGINEER PROPER COUNTERTOP SUPPORT AT DESIGN TO INSURE THIS AREA IS READILY ACCESSIBLE FOR CLEANING AND CASEWORK PLAN <br /> In D. CASEWORK VENDOR TO PROVIDE COMPLETE SHOP DRAWINGS AND ESPRESSO BAR AND OTHER WORKSTATIONS PER STARBUCKS MINIMUM FREE OF COUNTERTOP SUPPORT. <br /> 00 INSTALLATION PACKAGE TO GENERAL CONTRACTOR TO FACILITATE PROPER PERFORMANCE REQUIREMENTS. <br /> �? INSTALLATION. <br /> C:) SCALE: AS SHOWN <br /> u7 <br /> r SHEET NUMBER: <br /> N <br /> N <br /> T <br /> 102 <br /> co <br />