My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
33 (STATE ROUTE 33)
>
35100
>
2900 - Site Mitigation Program
>
PR0506447
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 8:59:29 AM
Creation date
6/25/2020 3:42:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0506447
PE
2960
FACILITY_ID
FA0007429
FACILITY_NAME
CROP PRODUCTION SERVICES VERNALIS FACILITY
STREET_NUMBER
35100
Direction
S
STREET_NAME
STATE ROUTE 33
City
VERNALIS
Zip
95385
APN
25518008
CURRENT_STATUS
01
SITE_LOCATION
35100 S HWY 33
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Brian Miller - 2 - 19 September 2003 <br /> cleanup levels for soil and groundwater based on the health risk assessment(HRA), and <br /> designated levels for soil for the constituents of concern at the site. As Table 1 shows,the WQO <br /> and designated levels are lower than the HRA cleanup levels with one exception. The HRA <br /> cleanup level for Endosulfan I and II for soil is lower than the designated level. Therefore, the <br /> HRA cleanup level for Endosulfan I and II for soil, the WQOs, and the designated levels for all <br /> other constituents in soil are the cleanup goals for the site. <br /> The Letter provides a site status update and proposes to submit the next semi-annual groundwater <br /> monitoring report and identification of wells in the vicinity of the site by 1 November 2003. <br /> Regional Board staff concurs with the proposed work and schedule in the Letter. The next <br /> semi-annual report needs to include a schedule proposing further delineation work, if needed, and <br /> submittal of a feasibility study report. If you have any questions, you may contact me at <br /> (916) 255-3119 or lewisd@rb5s.swrcb.ca.gov. <br /> —Q..fl1t.O <br /> DEVRA LEWIS <br /> Environmental Scientist <br /> Attachment <br /> cc: Mr. Michael Infurna, San Joaquin County Environmental Health Department, Stockton <br /> Ms.Nancy Bishop, Agrium, Lafayette <br /> Ms. Carolyn Kneiblher, GeoSyntec Consultants,Walnut Creek <br />
The URL can be used to link to this page
Your browser does not support the video tag.