Laserfiche WebLink
40 40 <br /> GEOSYNPEC CONSULTANTS <br /> Ms. Amy Terrell <br /> 14 April 2003 <br /> Page 2 <br /> ■ Delete "emanating from the property and" from the second sentence in the <br /> second paragraph of the first page. <br /> ■ Change "abandonment" to "destruction" in the first sentence of the third <br /> paragraph on the first page. <br /> ■ For the remediation pilot study testing (summarized on page 2 of the draft <br /> MRP), MW-4 and MW-5 are analyzed annually in the first quarter for the suite <br /> of bioremediation analyses. We would like the annual sampling of these wells <br /> to occur in third quarter of each year, to correspond with anniversary of HRC <br /> injection(June 2002). <br /> ■ WFS presently posts detected chemical concentrations on the quarterly <br /> groundwater elevation contour maps. We prefer to continue that data <br /> presentation and not include isoconcentration contour maps as described in Item <br /> (d) of the Semi-Annual Reporting Section. These isoconcentration contour <br /> maps have not been found to be helpful to evaluate conditions at similar sites. <br /> ■ Remove requirement for isoconcentration contour maps from Item (b) of the <br /> Annual Reporting Section. WFS agrees to post all chemical detections on <br /> groundwater elevation contour maps. <br /> RESPONSE TO SITE STATUS MEMORANDUM <br /> Included in the RWQCB's 5 March 2003 letter was a site status memorandum. The <br /> memorandum included several comments and action items for the site, which are <br /> summarized and addressed in the table below. <br /> P:\PRJ2003REM\WFS\VER\Terre11 RTC 4 2003.doc <br /> �� <br />