My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
33 (STATE ROUTE 33)
>
35100
>
2900 - Site Mitigation Program
>
PR0506447
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 8:59:29 AM
Creation date
6/25/2020 3:42:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0506447
PE
2960
FACILITY_ID
FA0007429
FACILITY_NAME
CROP PRODUCTION SERVICES VERNALIS FACILITY
STREET_NUMBER
35100
Direction
S
STREET_NAME
STATE ROUTE 33
City
VERNALIS
Zip
95385
APN
25518008
CURRENT_STATUS
01
SITE_LOCATION
35100 S HWY 33
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEOSYNTEC CONSULTANTS <br /> Ms. Amy Terrell <br /> 14 April 2003 <br /> Page 3 <br /> RWQCB Request When/Where F <br /> ■ Analyze for chlorinated herbicides and Next quarterly groundwater monitoring event, <br /> toluene in MW-2 and MW-3 scheduled for May 2003. <br /> ■ Addition of site features to site maps Next quarterly groundwater monitoring report, <br /> submitted to RWQCB by 30 April 2003. <br /> ■ Maintain same horizontal scale for all Next quarterly groundwater monitoring report, <br /> graphs on MW-2 data summary submitted to RWQCB by 30 April 2003. <br /> ■ Methane and carbon dioxide results Next quarterly groundwater monitoring report, <br /> corrected in Table 4—HRC Data submitted to RWQCB by 30 April 2003. <br /> ■ Soil characterization in northern area Following completion of the pilot study in June <br /> of site, near rinse pad and storm water 2004. <br /> pond <br /> ■ Submittal of plan to RWQCB to By 15 August 2003. <br /> address soils at the site <br /> ■ Diagram of 1995 soil excavations Included with plan submitted to RWQCB by 15 <br /> August 2003. <br /> ■ Septic system identified on site map. Included with plan submitted to RWQCB by 15 <br /> August 2003. <br /> If you have any questions, please contact Nancy Bishop of WFS at 925-283-0353 or <br /> the undersigned at 925-943-3034. <br /> Sin erely, (� <br /> �G�SD G60, d'� <br /> A.KNG <br /> $� No.389 Susan Skoe, E.I.T. <br /> CERTIFIED <br /> zz <br /> aff Engineer <br /> FiYDROGEM1 IST <br /> � ' <br /> P <br /> OF CAS-�r`� Carolyn R. Kneiblher, C.HG. <br /> Associate Hydrogeologist <br /> Copy to: Nancy Bishop, WFS <br /> Michael Infurna, San Joaquin Environmental Health Department, Stockton <br /> P:\PRJ2003REM\WFS\VER\Terre11 RTC 4 2003.doc <br /> Alp— <br /> t3 RR-�AW%CY«AME �� <br />
The URL can be used to link to this page
Your browser does not support the video tag.