Laserfiche WebLink
900003OAll CON-24 <br /> • A work plan must be submitted to the Department for review prior to <br /> commencing the work. <br /> • A fee is assessed for each boring. The fee amount will be <br /> determined after the Department has reviewed the work plan. <br /> • Borings must be backfilled with an approved material , usually <br /> cement-bentonite grout. <br /> 3-10 <br />